A platform for research: civil engineering, architecture and urbanism
Laboratory Study on Asphalt Concrete with Polypropylene Plastic and Non-selected Construction and Demolition Waste
A contribution for solving the depletion problem of natural resources and, simultaneously, the abundance of urban and industrial wastes, could be its application in pavement construction. For this purpose, a laboratory study is carried out in which Non-Selected Construction and Demolition Waste (NS CDW) and polypropylene (PP) plastic waste are incorporated in hot bituminous mixtures as potential replacements, respectively, for natural aggregates and bitumen. Four AC20 50/70 mixtures were put to test: a control mixture exclusively with natural aggregate; a mixture in which 10% of the mass of natural aggregate is replaced by NS CDW; a mixture in which 6% of the mass of bitumen is replaced by PP waste and a mixture in which are combined the replacement of 10% of the mass of natural aggregate by NS CDW and 6% of the mass of bitumen is replaced by PP waste. Results show that: i. a slight decrease in the Marshall stability and rise in the Optimal Bitumen Content in the mixture with 10% of NS CDW compared to the Control mixture; ii. adding PP to the mixture containing NS CDW retrieves the result for the optimum binder content obtained for the Control mixture. Both wastes diminish mixtures´ resistance to moisture.
Laboratory Study on Asphalt Concrete with Polypropylene Plastic and Non-selected Construction and Demolition Waste
A contribution for solving the depletion problem of natural resources and, simultaneously, the abundance of urban and industrial wastes, could be its application in pavement construction. For this purpose, a laboratory study is carried out in which Non-Selected Construction and Demolition Waste (NS CDW) and polypropylene (PP) plastic waste are incorporated in hot bituminous mixtures as potential replacements, respectively, for natural aggregates and bitumen. Four AC20 50/70 mixtures were put to test: a control mixture exclusively with natural aggregate; a mixture in which 10% of the mass of natural aggregate is replaced by NS CDW; a mixture in which 6% of the mass of bitumen is replaced by PP waste and a mixture in which are combined the replacement of 10% of the mass of natural aggregate by NS CDW and 6% of the mass of bitumen is replaced by PP waste. Results show that: i. a slight decrease in the Marshall stability and rise in the Optimal Bitumen Content in the mixture with 10% of NS CDW compared to the Control mixture; ii. adding PP to the mixture containing NS CDW retrieves the result for the optimum binder content obtained for the Control mixture. Both wastes diminish mixtures´ resistance to moisture.
Laboratory Study on Asphalt Concrete with Polypropylene Plastic and Non-selected Construction and Demolition Waste
Lecture Notes in Civil Engineering
Pereira, Paulo (editor) / Pais, Jorge (editor) / Caló, Manuel (author) / Vale, Cecília (author)
International Conference on Maintenance and Rehabilitation of Pavements ; 2024 ; Guimarães, Portugal
Proceedings of the 10th International Conference on Maintenance and Rehabilitation of Pavements ; Chapter: 48 ; 498-507
2024-07-21
10 pages
Article/Chapter (Book)
Electronic Resource
English
Laboratory evaluation of hot-mix asphalt containing construction and demolition waste
Online Contents | 2013
|Laboratory evaluation of hot-mix asphalt containing construction and demolition waste
British Library Online Contents | 2013
|Laboratory evaluation of hot-mix asphalt containing construction and demolition waste
BASE | 2013
|Pavement Performance of Asphalt Concrete Using Building Demolition Waste
Trans Tech Publications | 2014
|