Concrete work on construction of the arch dam for the Chirkey hydroelectric station
Conclusions 1. The concreting technology work adopted during construction of the Chirkey arch dam, including the delivery of concrete by cableway, intrablock mechanization on concrete and preparatory work, and the stringent sequence of preparing and concreting the blocks, permits performing work with a high quality and labor productivity, providing for raising the dam 7–8 m per month. 2. In order to further improve technology it is necessary to increase the speed of the cableways and their reliability, improve control of the bucket valve, and introduce motorized power buses or power buses on rails. 3. The means of intrablock mechanization developed at the construction site proved its high effectiveness and can be used under any climatic conditions on blocks with a small area and with reinforcement. It is expedient to create a family of such plant-manufactured machines, which will increase their reliability and output.
Concrete work on construction of the arch dam for the Chirkey hydroelectric station
Conclusions 1. The concreting technology work adopted during construction of the Chirkey arch dam, including the delivery of concrete by cableway, intrablock mechanization on concrete and preparatory work, and the stringent sequence of preparing and concreting the blocks, permits performing work with a high quality and labor productivity, providing for raising the dam 7–8 m per month. 2. In order to further improve technology it is necessary to increase the speed of the cableways and their reliability, improve control of the bucket valve, and introduce motorized power buses or power buses on rails. 3. The means of intrablock mechanization developed at the construction site proved its high effectiveness and can be used under any climatic conditions on blocks with a small area and with reinforcement. It is expedient to create a family of such plant-manufactured machines, which will increase their reliability and output.
Concrete work on construction of the arch dam for the Chirkey hydroelectric station
Danilov, A. S. (author) / Portnov, V. A. (author) / Sklyarenko, A. V. (author)
Hydrotechnical Construction ; 9 ; 927-933
1975-10-01
7 pages
Article (Journal)
Electronic Resource
English
Concrete work on construction of the arch dam for the Chirkey hydroelectric station
Online Contents | 1975
|Chirkey Hydroelectric Station: Design, Construction, Operation
British Library Online Contents | 1997
|Chirkey hydroelectric station: Design, construction, operation
Online Contents | 1997
|Chirkey hydroelectric station: Design, construction, operation
Springer Verlag | 1997
|Formwork operations on the construction of the arch dam of the Chirkey hydroelectric station
Online Contents | 1975
|