A platform for research: civil engineering, architecture and urbanism
Problems of improving underground hydraulic structure construction
Conclusion The examined directions of scientific and technical progress in the area of underground hydraulic construction are promising and can be very effective technically and economically. Considerable experience has presently been gained in the operation of large-section underground hydraulic structures. Generalization of this experience will per-mit a significant improvement in methods of designing and constructing these structures.
Problems of improving underground hydraulic structure construction
Conclusion The examined directions of scientific and technical progress in the area of underground hydraulic construction are promising and can be very effective technically and economically. Considerable experience has presently been gained in the operation of large-section underground hydraulic structures. Generalization of this experience will per-mit a significant improvement in methods of designing and constructing these structures.
Problems of improving underground hydraulic structure construction
Kuperman, V. L. (author)
Hydrotechnical Construction ; 8 ; 693-699
1974-08-01
7 pages
Article (Journal)
Electronic Resource
English
Problems of improving underground hydraulic structure construction
Online Contents | 1974
|Problems of improving methods of constructing underground hydraulic structures
Online Contents | 1967
|Problems of improving methods of constructing underground hydraulic structures
Springer Verlag | 1967
|International exhibition “underground hydraulic construction-71”
Online Contents | 1972
|International exhibition “underground hydraulic construction-71”
Springer Verlag | 1972
|