Construction Sustainability Through Visualisation of Building Operation
The maintenance phase of construction project exerts the biggest influence on project sustainability which is measured in terms of environmental, social and economic impacts. Building maintenance itself is profoundly influenced by decisions at the design phase. Typically, building maintenance programmes are designed using preventative or responsive approaches. While the former have an adverse impact on both the economic and environmental priorities, the responsive methods tend to compromise the interests of the users. It is therefore argued that the just-in-time methodology is the only approach that is capable of producing an optimised and balanced solution to building maintenance scheduling. However, due to its retrospective nature, this method has posed serious practical challenges. On the other hand, with the advent of visualisation technologies and virtual prototyping, we are now capable of making informed decisions about design parameters as well as generating building maintenance scheduling that would facilitate a just-in-time solution. This chapter presents a visual methodology for developing just-in-time solution through visualisation of the degradation of building components. To this end, the chapter presents the overall time-based visualisation model and demonstrates the simulation process for two major building components—the lighting and flooring systems.
Construction Sustainability Through Visualisation of Building Operation
The maintenance phase of construction project exerts the biggest influence on project sustainability which is measured in terms of environmental, social and economic impacts. Building maintenance itself is profoundly influenced by decisions at the design phase. Typically, building maintenance programmes are designed using preventative or responsive approaches. While the former have an adverse impact on both the economic and environmental priorities, the responsive methods tend to compromise the interests of the users. It is therefore argued that the just-in-time methodology is the only approach that is capable of producing an optimised and balanced solution to building maintenance scheduling. However, due to its retrospective nature, this method has posed serious practical challenges. On the other hand, with the advent of visualisation technologies and virtual prototyping, we are now capable of making informed decisions about design parameters as well as generating building maintenance scheduling that would facilitate a just-in-time solution. This chapter presents a visual methodology for developing just-in-time solution through visualisation of the degradation of building components. To this end, the chapter presents the overall time-based visualisation model and demonstrates the simulation process for two major building components—the lighting and flooring systems.
Construction Sustainability Through Visualisation of Building Operation
Dastbaz, Mohammad (editor) / Strange, Ian (editor) / Selkowitz, Stephen (editor) / Khosrowshahi, Farzad (author) / Ghodous, Parisa (author)
Building Sustainable Futures ; Chapter: 4 ; 63-84
2015-11-14
22 pages
Article/Chapter (Book)
Electronic Resource
English
Adaptive Visualisation System for Construction Building Information Models Using Saliency
ArXiv | 2016
|Building Design & Construction - Sustainability
NTIS | 2003
Visualisation in building design and analysis
British Library Conference Proceedings | 2000
|Indicator modelling and interactive visualisation for urban sustainability assessment
BASE | 2018
|