A platform for research: civil engineering, architecture and urbanism
Design of Rising Main for Amravati Water Supply Scheme
Rising main or pumping main is used to convey the water from source or reservoir to water treatment plant and further to the balancing reservoir or elevated service reservoir. If water treatment plant is located above reservoir sump level, water can be transmitted using direct pumping or combined pumping and gravity technique. This paper reviews the method for the analysis and design of combined pumping and gravity transmission system by provision of break pressure tank for Amravati water supply scheme. The water is lifted to break pressure tank by pumping main and thereafter, it is conveyed to water treatment plant using gravity main. The variable cost parameters of the transmission system such as cost of pipes, pumps and energy are studied. Diameters of both the pipes were found to achieve cost effectiveness and performance. Further, an alternate water transmission system was studied and designed. Lagrange multiplier method was used to develop mathematical model.
Design of Rising Main for Amravati Water Supply Scheme
Rising main or pumping main is used to convey the water from source or reservoir to water treatment plant and further to the balancing reservoir or elevated service reservoir. If water treatment plant is located above reservoir sump level, water can be transmitted using direct pumping or combined pumping and gravity technique. This paper reviews the method for the analysis and design of combined pumping and gravity transmission system by provision of break pressure tank for Amravati water supply scheme. The water is lifted to break pressure tank by pumping main and thereafter, it is conveyed to water treatment plant using gravity main. The variable cost parameters of the transmission system such as cost of pipes, pumps and energy are studied. Diameters of both the pipes were found to achieve cost effectiveness and performance. Further, an alternate water transmission system was studied and designed. Lagrange multiplier method was used to develop mathematical model.
Design of Rising Main for Amravati Water Supply Scheme
Lecture Notes in Civil Engineering
Gupta, Laxmikant Madanmanohar (editor) / Ray, Maya Rajnarayan (editor) / Labhasetwar, Pawan Kumar (editor) / Rai, R. K. (author) / Khandeshwar, S. R. (author)
2020-11-14
11 pages
Article/Chapter (Book)
Electronic Resource
English
Break pressure tank , Lagrange multiplier method , Pumping main , Water transmission system Engineering , Transportation Technology and Traffic Engineering , Building Materials , Waste Water Technology / Water Pollution Control / Water Management / Aquatic Pollution , Sustainable Architecture/Green Buildings , Landscape/Regional and Urban Planning , Water Quality/Water Pollution
Design of Rising Main for Amravati Water Supply Scheme
TIBKAT | 2021
|British Library Conference Proceedings | 2023
|British Library Conference Proceedings | 2021
|