A platform for research: civil engineering, architecture and urbanism
Research on Schedule Risk of Prefabricated Building Project Based on Social Network Analysis
As a new construction mode, prefabricated building plays an important role in promoting the industrialization of construction and realizing the industrialization and high-quality development of the construction industry. At present, prefabricated buildings are different from traditional construction forms in factory production, transportation, on-site assembly and other construction links, resulting in an increase in project schedule uncertainties, and traditional schedule risk management can no longer meet the development requirements of prefabricated buildings, so it is necessary to explore appropriate schedule risk management methods. Taking the construction project of a comprehensive teaching building in a university in Zhuhai as an example, this paper constructs a prefabricated building construction schedule risk grid model based on social network analysis, identifies key project schedule risk factors according to the analysis of social network related measurement indicators, and puts forward risk countermeasures.
Research on Schedule Risk of Prefabricated Building Project Based on Social Network Analysis
As a new construction mode, prefabricated building plays an important role in promoting the industrialization of construction and realizing the industrialization and high-quality development of the construction industry. At present, prefabricated buildings are different from traditional construction forms in factory production, transportation, on-site assembly and other construction links, resulting in an increase in project schedule uncertainties, and traditional schedule risk management can no longer meet the development requirements of prefabricated buildings, so it is necessary to explore appropriate schedule risk management methods. Taking the construction project of a comprehensive teaching building in a university in Zhuhai as an example, this paper constructs a prefabricated building construction schedule risk grid model based on social network analysis, identifies key project schedule risk factors according to the analysis of social network related measurement indicators, and puts forward risk countermeasures.
Research on Schedule Risk of Prefabricated Building Project Based on Social Network Analysis
Atlantis Highlights in Engineering
Kandel, Bijay Kumar (editor) / Yang, Jun (editor) / PRABHU, J. JOSE (editor) / Wang, Xueyuan (editor) / Li, Yan (author) / Li, Chunbao (author) / Zhao, Sujuan (author)
International Conference on Engineering Management ; 2023 ; Wuhan, China
Proceedings of the 2023 8th International Conference on Engineering Management (ICEM 2023) ; Chapter: 27 ; 252-260
2023-12-10
9 pages
Article/Chapter (Book)
Electronic Resource
English
Schedule Risk Analysis of Prefabricated Building Projects Based on DEMATEL-ISM and Bayesian Networks
DOAJ | 2025
|Project schedule risk management through building information modelling
Taylor & Francis Verlag | 2022
|Analysis of the Schedule Risk of Prefabricated Buildings Based on ISM and Research of Transfer Path
BASE | 2022
|