A platform for research: civil engineering, architecture and urbanism
Failure of Saddle Dam, Xe-Pian Xe-Namnoy Project: Executive Summary
The Saddle Dam D at the Hydroelectric Power project Xe-Pian Xe-Namnoy in the Lao People’s Democratic Republic failed on July 23, 2018. An Independent Expert Panel (IEP) was established to investigate into and report on the failure of the embankment dam. The Executive Summary of the IEP final report (Anton J. Schleiss, Jean-Pierre Tournier, and Ahmed F. Chraibi, Report of Independent Expert Panel (IEP), Xe-Pian Xe-Namnoy Project - Failure of Saddle Dam D, Final Report. 20 March 2019) is presented here.
Failure of Saddle Dam, Xe-Pian Xe-Namnoy Project: Executive Summary
The Saddle Dam D at the Hydroelectric Power project Xe-Pian Xe-Namnoy in the Lao People’s Democratic Republic failed on July 23, 2018. An Independent Expert Panel (IEP) was established to investigate into and report on the failure of the embankment dam. The Executive Summary of the IEP final report (Anton J. Schleiss, Jean-Pierre Tournier, and Ahmed F. Chraibi, Report of Independent Expert Panel (IEP), Xe-Pian Xe-Namnoy Project - Failure of Saddle Dam D, Final Report. 20 March 2019) is presented here.
Failure of Saddle Dam, Xe-Pian Xe-Namnoy Project: Executive Summary
Springer Ser.Geomech.,Geoengineer.
Zhang, Jian-Min (editor) / Zhang, Limin (editor) / Wang, Rui (editor) / Chraibi, Ahmed F. (author) / Schleiss, Anton J. (author) / Tournier, Jean-Pierre (author)
The International Conference on Embankment Dams ; 2020 ; Beijing, China
2020-04-21
3 pages
Article/Chapter (Book)
Electronic Resource
English
Underground support for Xe-Pian Xe-Namnoy hydropower project, Lao PDR - 128
British Library Conference Proceedings | 2017
|Network - Merce Cunningham, Mimi Zeiger - The Legacy Pian
Online Contents | 2012
Pian formation of Quaker Bridge dams
Engineering Index Backfile | 1890
|