A platform for research: civil engineering, architecture and urbanism
Abstract 11.1.1 Before the handover of each project, it shall be checked and accepted, and records shall be made; the comprehensive test shall be carried out before the completion of the monitoring system, and the reasons for the unqualified items shall be analyzed and rectified in time to ensure the acceptance of the project quality and handover.
Abstract 11.1.1 Before the handover of each project, it shall be checked and accepted, and records shall be made; the comprehensive test shall be carried out before the completion of the monitoring system, and the reasons for the unqualified items shall be analyzed and rectified in time to ensure the acceptance of the project quality and handover.
Project Acceptance
Yang, Yang (author)
2019-12-01
5 pages
Article/Chapter (Book)
Electronic Resource
English
Denver's Potable Reuse Project: Pathway to Public Acceptance
Wiley | 1980
|ECOCENTRE project: Acceptance procedures for low energy retrofitted buildings
British Library Conference Proceedings | 1998
|Acceptance Criteria for Concrete for Bridge/Grade Separator Project - A Practical Approach
British Library Online Contents | 1996
|British Library Conference Proceedings | 2011
|