A platform for research: civil engineering, architecture and urbanism
Deep Shaft Excavation: Design, Construction, and Their Challenges
Temporary shafts are constructed to facilitate the jacking and receiving of microtunnel boring machines (mTBM) used in pipe jacking works, hence the terminology ‘jacking’ or ‘launching’ shafts and ‘receiving’ or ‘retrieval’ shafts. Shafts vary in diameters and depths due to the varying lengths and diameters of the jacking pipes used to create the sewer network. The design of shafts is very much aligned to the design of a typical deep excavation.
Deep Shaft Excavation: Design, Construction, and Their Challenges
Temporary shafts are constructed to facilitate the jacking and receiving of microtunnel boring machines (mTBM) used in pipe jacking works, hence the terminology ‘jacking’ or ‘launching’ shafts and ‘receiving’ or ‘retrieval’ shafts. Shafts vary in diameters and depths due to the varying lengths and diameters of the jacking pipes used to create the sewer network. The design of shafts is very much aligned to the design of a typical deep excavation.
Deep Shaft Excavation: Design, Construction, and Their Challenges
Cities res. ser.
Ong, Dominic Ek Leong (author) / Barla, Marco (author) / Cheng, Jason Wen-Chieh (author) / Choo, Chung Siung (author) / Sun, Minmin (author) / Peerun, Mohammud Irfaan (author)
2022-02-28
43 pages
Article/Chapter (Book)
Electronic Resource
English
Novel Excavation and Construction Method for a Deep Shaft Excavation in Ultrathick Aquifers
DOAJ | 2019
|Open excavation foundation pit and underground excavation vertical shaft construction technology
European Patent Office | 2024
|Shaft excavation in soft clay by Caisson construction
British Library Conference Proceedings | 1993
|