A platform for research: civil engineering, architecture and urbanism
Electrical Testing Technology of Lunar Lander
After system assembly and integration of the lunar lander was completed, the system electrical integration test should be conducted. The integration test was an important step in development of the lunar lander, which ran through the whole process from system integration to launch. The integrated system development was composed of system design, instrument development, assembly and integration and system electrical test.
Electrical Testing Technology of Lunar Lander
After system assembly and integration of the lunar lander was completed, the system electrical integration test should be conducted. The integration test was an important step in development of the lunar lander, which ran through the whole process from system integration to launch. The integrated system development was composed of system design, instrument development, assembly and integration and system electrical test.
Electrical Testing Technology of Lunar Lander
Space Technology Library
Yu, Deng-Yun (author) / Sun, Ze-Zhou (author) / Zhang, He (author)
2021-03-26
22 pages
Article/Chapter (Book)
Electronic Resource
English
System Testing and Validation Technology of Lunar Lander
Springer Verlag | 2021
|Technology of lunar soft lander
TIBKAT | 2021
|Metrology Technology of Lunar Lander
Springer Verlag | 2021
|OBDH Technology of Lunar Lander
Springer Verlag | 2021
|Power Technology of Lunar Lander
Springer Verlag | 2021
|