A platform for research: civil engineering, architecture and urbanism
Breaching Process of “11·03” Dammed Lake and Flood Routing
Accurate prediction of the breach hydrograph and flood routing is crucial step for emergency response of the breaching of a dammed lake. On October 10 and November 3, 2018, two successive landslides in the same place occurred at Baige village, the border of Sichuan Province and Tibet Autonomous Region, China, which totally dammed the Jinsha River twice.
Breaching Process of “11·03” Dammed Lake and Flood Routing
Accurate prediction of the breach hydrograph and flood routing is crucial step for emergency response of the breaching of a dammed lake. On October 10 and November 3, 2018, two successive landslides in the same place occurred at Baige village, the border of Sichuan Province and Tibet Autonomous Region, China, which totally dammed the Jinsha River twice.
Breaching Process of “11·03” Dammed Lake and Flood Routing
Springer Ser.Geomech.,Geoengineer.
Zhang, Jian-Min (editor) / Zhang, Limin (editor) / Wang, Rui (editor) / Wang, Lin (author) / Zhong, Qiming (author) / Shan, Yibo (author) / Cai, Simin (author)
The International Conference on Embankment Dams ; 2020 ; Beijing, China
2020-04-21
2 pages
Article/Chapter (Book)
Electronic Resource
English
Breaching Process of “11:03” Dammed Lake and Flood Routing
TIBKAT | 2020
|Analysis of Dam Breaching Flood Routing
Wiley | 2016
|Simulation of Dam Breaching and Flood Routing on the Jinsha River
Springer Verlag | 2020
|