A platform for research: civil engineering, architecture and urbanism
Preventive Maintenance Prioritization by Fuzzy Logic for Seamless Hydro Power Generation
Abstract Preventive maintenance prioritization is one of the most important criteria for the electricity generation planners to minimize the down time and production costs. Break down of equipments increases costs and plant down time results in loss of business. This work focuses on prioritizing the preventive maintenance for seamless hydro power generation considering (24 × 7) client’s power demand using fuzzy logic. The main task involves prioritizing the maintenance work considering constraints of varied power demand and hydro turbine plant breakdown. Fuzzy logic is used to optimize the preventive maintenance prioritization under the main constraints. Manual fuzzy arithmetic is used to develop the model and MATLAB Fuzzy Inference System editor used to validate the same. This novel fuzzy logic approach of preventive maintenance prioritizing for hydro power generation is absent in renewable power generation and industrial engineering literatures due to its assessment complexity.
Preventive Maintenance Prioritization by Fuzzy Logic for Seamless Hydro Power Generation
Abstract Preventive maintenance prioritization is one of the most important criteria for the electricity generation planners to minimize the down time and production costs. Break down of equipments increases costs and plant down time results in loss of business. This work focuses on prioritizing the preventive maintenance for seamless hydro power generation considering (24 × 7) client’s power demand using fuzzy logic. The main task involves prioritizing the maintenance work considering constraints of varied power demand and hydro turbine plant breakdown. Fuzzy logic is used to optimize the preventive maintenance prioritization under the main constraints. Manual fuzzy arithmetic is used to develop the model and MATLAB Fuzzy Inference System editor used to validate the same. This novel fuzzy logic approach of preventive maintenance prioritizing for hydro power generation is absent in renewable power generation and industrial engineering literatures due to its assessment complexity.
Preventive Maintenance Prioritization by Fuzzy Logic for Seamless Hydro Power Generation
Roy, P. K. (author) / Adhikary, P. (author) / Mazumdar, A. (author)
2014-06-01
8 pages
Article (Journal)
Electronic Resource
English
Maintenance prioritization of interlocking concrete block pavement using fuzzy logic
Springer Verlag | 2020
|SMALL HYDRO - Fuzzy logic makes power generation much clearer
Online Contents | 1999
Prioritization of Low-Volume Pavement Sections for Maintenance by Using Fuzzy Logic
British Library Conference Proceedings | 2007
|Prioritization of Low-Volume Pavement Sections for Maintenance by Using Fuzzy Logic
British Library Online Contents | 2007
|Engineering Index Backfile | 1950
|