A platform for research: civil engineering, architecture and urbanism
Trench method for driving portions of the tailrace tunnel of the Ingursk hydroelectric plant in poor rock
Trench method for driving portions of the tailrace tunnel of the Ingursk hydroelectric plant in poor rock
Trench method for driving portions of the tailrace tunnel of the Ingursk hydroelectric plant in poor rock
Lomaya, P. S. (author)
Hydrotechnical Construction ; 2 ; 759-762
1968-09-01
4 pages
Article (Journal)
Electronic Resource
English
Deterioration of apron and tailrace canal portions of the Irkutsk hydroelectric plant
Springer Verlag | 1969
|Deterioration of apron and tailrace canal portions of the Irkutsk hydroelectric plant
Online Contents | 1969
|Drilling-blasting work for the tailrace canal of the Hevoskosk hydroelectric plant
Springer Verlag | 1970
|