A platform for research: civil engineering, architecture and urbanism
Performance Monitoring of Project Earned Value considering Scope and Quality
By analyzing the principles of the project earned value management method, we find that the performance monitoring of project earned value encounters the problem of neglecting the impacts of the project’s scope and quality on the cost and schedule deviations, which will affect the project earned value performance monitoring. This paper designed a process and method of project earned value performance monitoring considering the scope and quality, and its application is analyzed using a specific case. The results show that the scientific project schedule and cost performance results can be obtained by integrating the scope and quality into the project earned value performance monitoring system while also considering the project’s baseline changes based on the activity and critical path perspectives. Finally, the conclusions of this research are summarized and future research directions are given.
Performance Monitoring of Project Earned Value considering Scope and Quality
By analyzing the principles of the project earned value management method, we find that the performance monitoring of project earned value encounters the problem of neglecting the impacts of the project’s scope and quality on the cost and schedule deviations, which will affect the project earned value performance monitoring. This paper designed a process and method of project earned value performance monitoring considering the scope and quality, and its application is analyzed using a specific case. The results show that the scientific project schedule and cost performance results can be obtained by integrating the scope and quality into the project earned value performance monitoring system while also considering the project’s baseline changes based on the activity and critical path perspectives. Finally, the conclusions of this research are summarized and future research directions are given.
Performance Monitoring of Project Earned Value considering Scope and Quality
KSCE J Civ Eng
Liu, Guangping (author) / Jiang, Han (author)
KSCE Journal of Civil Engineering ; 24 ; 10-18
2020-01-01
9 pages
Article (Journal)
Electronic Resource
English
Earned Value Method and Customer Earned Value
British Library Online Contents | 2002
|Earned Value-Based Performance Monitoring of Facility Construction Projects
BASE | 2013
|The Project Performance Evaluation of PLBN Project Using Earned Value Management Method
BASE | 2021
|