A platform for research: civil engineering, architecture and urbanism
Small hydroelectric stations and prospects of their development
Conclusions 1.For supplying electricity to regions of Kirgizia located beyond the limits of the power system with an area of 400,000–500,000 ha by the existing methods of autonomous power supply with a total power of more than 150,000 kW, more than 30,000 tons of liquid fuel per year are required, for hauling which a fleet of vehicles in an amount of 10,000 machine-days/ yr is necessary. 2.The hydropower resources of small streams numbering about 900 with a total annual runoff of 51 billion m3 can be used to irrigate 400,000–600,000 ha of farmlands, which will enable the republic to increase the total sheep stock. 3.It is necessary to widely introduce micro-HESs by the serial manufacture of hydropower blocks with a capacity of 10–30 kW, having generalized the experience of their design and having created an album of standard designs of micro-HESs. It is expedient to create a specialized organization for the installation, adjustment, and servicing of micro-HESs. In the future it is planned to introduce about 10,000 micro-HESs with a capacity from 1 to 30 kW in the republic.
Small hydroelectric stations and prospects of their development
Conclusions 1.For supplying electricity to regions of Kirgizia located beyond the limits of the power system with an area of 400,000–500,000 ha by the existing methods of autonomous power supply with a total power of more than 150,000 kW, more than 30,000 tons of liquid fuel per year are required, for hauling which a fleet of vehicles in an amount of 10,000 machine-days/ yr is necessary. 2.The hydropower resources of small streams numbering about 900 with a total annual runoff of 51 billion m3 can be used to irrigate 400,000–600,000 ha of farmlands, which will enable the republic to increase the total sheep stock. 3.It is necessary to widely introduce micro-HESs by the serial manufacture of hydropower blocks with a capacity of 10–30 kW, having generalized the experience of their design and having created an album of standard designs of micro-HESs. It is expedient to create a specialized organization for the installation, adjustment, and servicing of micro-HESs. In the future it is planned to introduce about 10,000 micro-HESs with a capacity from 1 to 30 kW in the republic.
Small hydroelectric stations and prospects of their development
Panasyuk, A. M. (author) / Tokombaev, K. A. (author) / Shainova, G. I. (author)
Hydrotechnical Construction ; 21 ; 366-373
1987-06-01
8 pages
Article (Journal)
Electronic Resource
English
Small hydroelectric stations and prospects of their development
Online Contents | 1987
|Classification of small hydroelectric stations and standardization of their units
Online Contents | 1985
|