A platform for research: civil engineering, architecture and urbanism
Time Cost Optimization Applied in Transit Camps
This article is evaluation of transit camps (temporary structures) on the scale of time and cost. Construction activities are scheduled to be completed in specific time frame with some determined expenditure and required number of resources. Delay in construction projects leads to both excessive duration as well as expense which results in loss of stake holders and investors. The subsequent improvement in “transit camps”, continues to develop the lifestyle of people residing in slum areas. This article examines the financial and time savings by planning, scheduling of activities, with qualitative outputs and ease for the people residing in these camps. According to the current status and available data by the literature reviews, it demonstrates the advantages and benefits of transit camps for a project. Additionally, this study focuses on the optimization of cost and time of activities which may reduce delays and indirectly help in economic savings with advanced construction management techniques.
Time Cost Optimization Applied in Transit Camps
This article is evaluation of transit camps (temporary structures) on the scale of time and cost. Construction activities are scheduled to be completed in specific time frame with some determined expenditure and required number of resources. Delay in construction projects leads to both excessive duration as well as expense which results in loss of stake holders and investors. The subsequent improvement in “transit camps”, continues to develop the lifestyle of people residing in slum areas. This article examines the financial and time savings by planning, scheduling of activities, with qualitative outputs and ease for the people residing in these camps. According to the current status and available data by the literature reviews, it demonstrates the advantages and benefits of transit camps for a project. Additionally, this study focuses on the optimization of cost and time of activities which may reduce delays and indirectly help in economic savings with advanced construction management techniques.
Time Cost Optimization Applied in Transit Camps
Lecture Notes in Civil Engineering
Pathak, Krishna Kant (editor) / Bandara, J. M. S. J. (editor) / Agrawal, Ramakant (editor) / Farooq, Chauhan Mohammed Shuaib (author) / Mahajan, Girish (author)
International Conference on Recent Advances in Civil Engineering ; 2022
2023-10-03
16 pages
Article/Chapter (Book)
Electronic Resource
English
Whose Shadow? On Camps and Counter-Camps
Springer Verlag | 2023
|Engineering Index Backfile | 1899
|Convict labor on highway work: Organization, camps and cost data
Engineering Index Backfile | 1919
Engineering Index Backfile | 1942