A platform for research: civil engineering, architecture and urbanism
Short Review on Some Estimation of Probable Maximum Precipitation Studies
Surpassing a dam shape can bring about harm to the dam divider or projections through breaking. Those mistakes can result in the marvelous danger of biting the earth toll, sudden cost of redoing the dam, the pace of the more flood hurt downstream and charge to the network due to the flight of a water supply. Gigantic precipitation and its antagonistic effects, for the greatest thing through floods, are represented from most bits of the segment. The reduction of such results, e.g., by means of planning (dams, etc.), requires measurements at the degree and repeat of huge precipitation events. The measurements are commonly gotten from a period relationship of saw past occasions. By means of their inclination, such events are conflicting; frequently, a repeat of one such occasion for every one hundred years is mounted. Observational spans oftentimes include occasions of a totally two or three decades. This article moreover attempts to review issues by angle explanations on likely most extreme precipitation (PMP) and PMF, around unmistakable methods for PMF estimations, use of PMP and PMF relying upon past assessments, test research of PMP and PMF.
Short Review on Some Estimation of Probable Maximum Precipitation Studies
Surpassing a dam shape can bring about harm to the dam divider or projections through breaking. Those mistakes can result in the marvelous danger of biting the earth toll, sudden cost of redoing the dam, the pace of the more flood hurt downstream and charge to the network due to the flight of a water supply. Gigantic precipitation and its antagonistic effects, for the greatest thing through floods, are represented from most bits of the segment. The reduction of such results, e.g., by means of planning (dams, etc.), requires measurements at the degree and repeat of huge precipitation events. The measurements are commonly gotten from a period relationship of saw past occasions. By means of their inclination, such events are conflicting; frequently, a repeat of one such occasion for every one hundred years is mounted. Observational spans oftentimes include occasions of a totally two or three decades. This article moreover attempts to review issues by angle explanations on likely most extreme precipitation (PMP) and PMF, around unmistakable methods for PMF estimations, use of PMP and PMF relying upon past assessments, test research of PMP and PMF.
Short Review on Some Estimation of Probable Maximum Precipitation Studies
Water Res.Develop.Managem.
Mohd Sidek, Lariyah (editor) / Salih, Gasim Hayder Ahmed (editor) / Boosroh, Mohd Hariffin (editor) / Isparan, Kamini (author) / Mohd Sidek, Lariyah (author) / Basri, Hidayah (author) / Hoong, Kah (author) / Rafzi, Rashid (author)
International Conference on Dam Safety Management and Engineering ; 2019 ; Penang, Malaysia
2019-11-21
7 pages
Article/Chapter (Book)
Electronic Resource
English
Estimations , Probable maximum precipitation , Probable maximum flood Environment , Environmental Management , Water Policy/Water Governance/Water Management , Quality Control, Reliability, Safety and Risk , Environmental Economics , Risk Management , Waste Water Technology / Water Pollution Control / Water Management / Aquatic Pollution , Earth and Environmental Science
Generalised Probable Maximum Precipitation Estimation Techniques for Australia
British Library Online Contents | 1994
|Estimating the Probable Maximum Precipitation
ASCE | 2021
|Extreme precipitation modeling and Probable Maximum Precipitation (PMP) estimation in Chile
Elsevier | 2025
|Extreme precipitation modeling and Probable Maximum Precipitation (PMP) estimation in Chile
DOAJ | 2025
|Estimating the Probable maximum Precipitation
ASCE | 2021
|