A platform for research: civil engineering, architecture and urbanism
Overflow road crossing across the Dnestr River at the construction site of the Dnestr hydrostation
Conclusions 1. Two-year operation of the overflow road crossing proved its serviceability, and the simplicity and quickness of its construction and relatively low cost proved its economic effectiveness. 2. Such a temporary overflow crossing can be used when constructing other hydrostations, and a maximum effectiveness can be achieved when the river bed and banks are resistant to erosion (then their reinforcement is eliminated). 3. Such an overflow bridge can be used also as a permanent structure for secondary roads under appropriate circumstances. 4. For all this, it is necessary to count on a loss of traffic between the river banks during the passage of floods. To some extent this can be regulated by designating the appropriate crest height of the crossing and cross section of the outlets.
Overflow road crossing across the Dnestr River at the construction site of the Dnestr hydrostation
Conclusions 1. Two-year operation of the overflow road crossing proved its serviceability, and the simplicity and quickness of its construction and relatively low cost proved its economic effectiveness. 2. Such a temporary overflow crossing can be used when constructing other hydrostations, and a maximum effectiveness can be achieved when the river bed and banks are resistant to erosion (then their reinforcement is eliminated). 3. Such an overflow bridge can be used also as a permanent structure for secondary roads under appropriate circumstances. 4. For all this, it is necessary to count on a loss of traffic between the river banks during the passage of floods. To some extent this can be regulated by designating the appropriate crest height of the crossing and cross section of the outlets.
Overflow road crossing across the Dnestr River at the construction site of the Dnestr hydrostation
Shmul'son, B. D. (author)
Hydrotechnical Construction ; 14 ; 1115-1119
1980-11-01
5 pages
Article (Journal)
Electronic Resource
English
Overflow road crossing across the Dnestr River at the construction site of the Dnestr hydrostation
Online Contents | 1980
|Ecological release and its realization on the Dnestr river
Online Contents | 1993
|Mechanical equipment of the Dnestr multipurpose hydropower development
Online Contents | 1984
|Experience in preparing the rock foundation of the Dnestr hydroelectric station
Online Contents | 1981
|Transformation of releases in the lower pool of the dnestr hydroelectric station
Springer Verlag | 1991
|