A platform for research: civil engineering, architecture and urbanism
The Tower of Cable Stayed Railway Bridge Over Anji River
In the high seismic hazard region of Kashmire, close to the Himalayan mountains, an important cable stayed railway bridge, with a main span of 290 m crossing the Anji valley 190 m above the river bed, is under construction. Due to the particular orography of the valley, the bridge shall have an asymmetric structural scheme, with a 200 m high single tower and 20 m diameter well foundation. The main features of the already completed tower will be illustrated more specifically with reference to heavily stressed post-tensioned transition pieces..
The Tower of Cable Stayed Railway Bridge Over Anji River
In the high seismic hazard region of Kashmire, close to the Himalayan mountains, an important cable stayed railway bridge, with a main span of 290 m crossing the Anji valley 190 m above the river bed, is under construction. Due to the particular orography of the valley, the bridge shall have an asymmetric structural scheme, with a 200 m high single tower and 20 m diameter well foundation. The main features of the already completed tower will be illustrated more specifically with reference to heavily stressed post-tensioned transition pieces..
The Tower of Cable Stayed Railway Bridge Over Anji River
Lecture Notes in Civil Engineering
Aiello, Maria Antonietta (editor) / Bilotta, Antonio (editor) / Petrangeli, Mario Paolo (author) / Di Bianco, Roberto (author) / Polastri, Andrea (author)
Italian Concrete Conference ; 2022 ; Naples, Italy
2023-09-15
18 pages
Article/Chapter (Book)
Electronic Resource
English
The cable-stayed railway bridge over the Po river
British Library Conference Proceedings | 1994
|Four-tower cable-stayed bridge
Online Contents | 1998
European Patent Office | 2023
|