Toppling rock slope failures examples of analysis and stabilization
Summary Toppling Rock Slope Failures — Examples of Analysis and Stabilization Three case histories of toppling failures of rock slopes, and the methods used to ensure that failure did not disrupt operations below the slope, are described. The application of Goodman and Bray's limit equilibrium analysis of multi-block failures to these three slopes is demonstrated. The first failure occurred in a 20 m high granite slope that was stabilized by removing the top 6 m and installing a number of tensioned rock anchors in the toe. The second failure occurred in a sequence of folded sandstone, shale and coal. This slide was too large to stabilize, so the movement rate was monitored while mining continued in the pit below until shortly before failure took place. In the third failure, the top 8 m of a single 12 m high toppling block was removed by blasting to prevent further rotational movement.
Zusammenfassung Kippvorgänge beim Bruch von Felsböschungen — Beispiele für die Berechnung und Stabilisierung Es werden drei Fallstudien von Brüchen von Felsböschungen durch Kippen und die dabei angewendeten Sicherungsmethoden beschrieben. Die Anwendung der Grenzgleichgewichtsbetrachtung von Massenbewegungen, die durch Kippvorgänge ausgelöst wurden, nach Goodman and Bray, auf drei Felshänge wird gezeigt. Der erste Bruch ereignete sich in einer 20 m hohen Böschung in Granit. Die Stabilisierung bestand in der Entfernung der obersten 6 m und der Einbringung von einigen Vorspannankern. Der zweite Bruch ereignete sich in einer Serie von gefalteten Sandsteinen, Schiefern und Kohlen. Da die Größe dieser Rutschung eine Stabilisierung unmöglich machte, wurden die Bewegungen genau registriert und der Abbau bis kurz vor dem eigentlichen Bruch fortgesetzt. Das dritte Beispiel ist ein einzelner 12 m hoher, kippender Block, dessen oberste 8 m weggesprengt wurde, um ein weiteres Kippen zu verhindern.
Résumé Défauts par chute de rampes rocheuses — Exemples des analyses et de stabilisation Ce résumé décrit trois événements de rupture de pentes rocheuses et les méthodes de stabilisation utilisées. Dans ces trois cas l'auteur montre l'utilisation de l'analyse de la limite d'équilibre des masses rocheuses pour un mouvement de basculement selon Goodman et Bray. Le premier cas a eu lieu sur une rampe granitique de 20 m hauteur, laquelle a été stabilisée en 6 m de roche au sommet et en possant quelque d'ancrage au pied de la pente. La deuxième défaut s'a produit avec une séquence de roches de formation gréseuse, d'argile schisteuse et du charbon. Cette glissement a été trop grande pour être stabilisée, donc la raison de mouvement a été controlée au même temps qu'on travaillait dans le puit au dessous quelque temps avant que le défaut se produisse. Dans le troisième défaut les 8 m de sommet d'un seul bloc rocheux ont été dépilés par des méthodes explosifs pour prévenir ultérieur mouvements rotatives.
Toppling rock slope failures examples of analysis and stabilization
Summary Toppling Rock Slope Failures — Examples of Analysis and Stabilization Three case histories of toppling failures of rock slopes, and the methods used to ensure that failure did not disrupt operations below the slope, are described. The application of Goodman and Bray's limit equilibrium analysis of multi-block failures to these three slopes is demonstrated. The first failure occurred in a 20 m high granite slope that was stabilized by removing the top 6 m and installing a number of tensioned rock anchors in the toe. The second failure occurred in a sequence of folded sandstone, shale and coal. This slide was too large to stabilize, so the movement rate was monitored while mining continued in the pit below until shortly before failure took place. In the third failure, the top 8 m of a single 12 m high toppling block was removed by blasting to prevent further rotational movement.
Zusammenfassung Kippvorgänge beim Bruch von Felsböschungen — Beispiele für die Berechnung und Stabilisierung Es werden drei Fallstudien von Brüchen von Felsböschungen durch Kippen und die dabei angewendeten Sicherungsmethoden beschrieben. Die Anwendung der Grenzgleichgewichtsbetrachtung von Massenbewegungen, die durch Kippvorgänge ausgelöst wurden, nach Goodman and Bray, auf drei Felshänge wird gezeigt. Der erste Bruch ereignete sich in einer 20 m hohen Böschung in Granit. Die Stabilisierung bestand in der Entfernung der obersten 6 m und der Einbringung von einigen Vorspannankern. Der zweite Bruch ereignete sich in einer Serie von gefalteten Sandsteinen, Schiefern und Kohlen. Da die Größe dieser Rutschung eine Stabilisierung unmöglich machte, wurden die Bewegungen genau registriert und der Abbau bis kurz vor dem eigentlichen Bruch fortgesetzt. Das dritte Beispiel ist ein einzelner 12 m hoher, kippender Block, dessen oberste 8 m weggesprengt wurde, um ein weiteres Kippen zu verhindern.
Résumé Défauts par chute de rampes rocheuses — Exemples des analyses et de stabilisation Ce résumé décrit trois événements de rupture de pentes rocheuses et les méthodes de stabilisation utilisées. Dans ces trois cas l'auteur montre l'utilisation de l'analyse de la limite d'équilibre des masses rocheuses pour un mouvement de basculement selon Goodman et Bray. Le premier cas a eu lieu sur une rampe granitique de 20 m hauteur, laquelle a été stabilisée en 6 m de roche au sommet et en possant quelque d'ancrage au pied de la pente. La deuxième défaut s'a produit avec une séquence de roches de formation gréseuse, d'argile schisteuse et du charbon. Cette glissement a été trop grande pour être stabilisée, donc la raison de mouvement a été controlée au même temps qu'on travaillait dans le puit au dessous quelque temps avant que le défaut se produisse. Dans le troisième défaut les 8 m de sommet d'un seul bloc rocheux ont été dépilés par des méthodes explosifs pour prévenir ultérieur mouvements rotatives.
Toppling rock slope failures examples of analysis and stabilization
Wyllie, Duncan C. (author)
Rock mechanics ; 13 ; 89-98
1980-11-01
10 pages
Article (Journal)
Electronic Resource
English
Modelling of flexural toppling failures of rock slopes
British Library Conference Proceedings | 1995
|A transfer coefficient method for rock slope toppling
British Library Online Contents | 2009
|Three-Dimensional Analysis Method for Stability of Toppling Rock Slope
European Patent Office | 2020
|A transfer coefficient method for rock slope toppling
Online Contents | 2009
|