A platform for research: civil engineering, architecture and urbanism
Hydraulic filling of tailings with a limited sand content
Conclusions 1. In the case of a limited content of sand in tailings (<30%) hydraulic filling of a tailings dump with the formation of a sand beach of sufficient length is possible, provided that the maximum bulk density of the hydraulic mixture is not exceeded (not above≥70% sand deposition for the investigated tailings dumps). 2. The results obtained are applicable under conditions similar to those which were investigated and can be used in the case of hydraulic filling of earth.
Hydraulic filling of tailings with a limited sand content
Conclusions 1. In the case of a limited content of sand in tailings (<30%) hydraulic filling of a tailings dump with the formation of a sand beach of sufficient length is possible, provided that the maximum bulk density of the hydraulic mixture is not exceeded (not above≥70% sand deposition for the investigated tailings dumps). 2. The results obtained are applicable under conditions similar to those which were investigated and can be used in the case of hydraulic filling of earth.
Hydraulic filling of tailings with a limited sand content
Volnin, B. A. (author) / Sarvin, G. T. (author)
Hydrotechnical Construction ; 4 ; 909-911
1970-10-01
3 pages
Article (Journal)
Electronic Resource
English
Hydraulic filling of tailings with a limited sand content
Online Contents | 1970
|Rational organization of hydraulic filling of tailings pond
Online Contents | 1976
|Rational organization of hydraulic filling of tailings pond
Springer Verlag | 1976
|Fundamental studies on hydraulic sand-filling
Engineering Index Backfile | 1965
|Measurement of hydraulic conductivity in oil sand tailings slurries
British Library Online Contents | 1996
|