A platform for research: civil engineering, architecture and urbanism
Operating experience at the Krasnoyarsk hydroelectric plant
Conclusions 1. In the early stages of construction the management of the Krasnoyarsk hydroelectric plant was included, together with design and construction organizations, in work on improving design solutions to increase the operating quality of the structures and equipment. 2. Participation of management in the analysis of design solutions has made it possible to discover and resolve in good time a number of problems associated with the provision of effective operational organization: selection of intake elevations for the hydraulic turbines, setting of the machine gallery, layout of the open distribution device, selection of transport systems, the disposition and outfitting of workshops, etc. 3. Operating personnel, together with plant fabricators, have completed a large volume of work involving the mastering of heavy-duty unique equipment and the improvement of its reliability. 4. The experience gained at the Krasnoyarsk plant should be distributed for use in all hydroelectric plants under construction, while the noted disadvantages should be considered in designing large-scale hydroelectric plants.
Operating experience at the Krasnoyarsk hydroelectric plant
Conclusions 1. In the early stages of construction the management of the Krasnoyarsk hydroelectric plant was included, together with design and construction organizations, in work on improving design solutions to increase the operating quality of the structures and equipment. 2. Participation of management in the analysis of design solutions has made it possible to discover and resolve in good time a number of problems associated with the provision of effective operational organization: selection of intake elevations for the hydraulic turbines, setting of the machine gallery, layout of the open distribution device, selection of transport systems, the disposition and outfitting of workshops, etc. 3. Operating personnel, together with plant fabricators, have completed a large volume of work involving the mastering of heavy-duty unique equipment and the improvement of its reliability. 4. The experience gained at the Krasnoyarsk plant should be distributed for use in all hydroelectric plants under construction, while the noted disadvantages should be considered in designing large-scale hydroelectric plants.
Operating experience at the Krasnoyarsk hydroelectric plant
Bryzgalov, V. I. (author) / Liskan, E. E. (author)
Hydrotechnical Construction ; 12 ; 650-657
1978-07-01
8 pages
Article (Journal)
Electronic Resource
English
Operating experience at the Krasnoyarsk hydroelectric plant
Online Contents | 1978
|Experience in operating the overflow dam of the Krasnoyarsk hydroelectric station
Springer Verlag | 1987
|Mechanical equipment at the Krasnoyarsk hydroelectric plant
Online Contents | 1972
|Mechanical equipment at the Krasnoyarsk hydroelectric plant
Springer Verlag | 1972
|Concreting operations at the Krasnoyarsk hydroelectric plant
Springer Verlag | 1972
|