A platform for research: civil engineering, architecture and urbanism
Closing the Zeya River for construction of the Zeya hydroelectric power station
Closing the Zeya River for construction of the Zeya hydroelectric power station
Closing the Zeya River for construction of the Zeya hydroelectric power station
Smyslov, V. A. (author) / Breikin, A. G. (author)
Hydrotechnical Construction ; 9 ; 741-744
1975-08-01
4 pages
Article (Journal)
Electronic Resource
English
Closing the Zeya River for construction of the Zeya hydroelectric power station
Online Contents | 1975
|First-stage cofferdams at the zeya hydroelectric plant
Springer Verlag | 1973
|Hydraulic tests of the spillway of the Zeya hydroelectric station
Online Contents | 1987
|Concreting the diversion dewatering outlets of the Zeya hydroelectric station
Springer Verlag | 1982
|Seismological monitoring of the region of the zeya hydroelectric station
Springer Verlag | 1998
|