A platform for research: civil engineering, architecture and urbanism
Improvement of the thermal expansions and vibration reliability in the pgrading of the K-330-240 turbo units of the kashira state regional power plant (GRÉS)
Methods of normalizing the thermal expansions that occur in turbo units of different powers are considered. A modern solution for the assembly of sleeve joints using a hydraulic instrument to increase the vibration reliability is proposed. The measures described for repairing turbo units enable the amount of effort and time of subsequent capital repairs to be reduced considerably for relatively low initial costs.
Improvement of the thermal expansions and vibration reliability in the pgrading of the K-330-240 turbo units of the kashira state regional power plant (GRÉS)
Methods of normalizing the thermal expansions that occur in turbo units of different powers are considered. A modern solution for the assembly of sleeve joints using a hydraulic instrument to increase the vibration reliability is proposed. The measures described for repairing turbo units enable the amount of effort and time of subsequent capital repairs to be reduced considerably for relatively low initial costs.
Improvement of the thermal expansions and vibration reliability in the pgrading of the K-330-240 turbo units of the kashira state regional power plant (GRÉS)
Don, E. A. (author) / Taradai, D. V. (author) / Ponomarenko, A. P. (author) / Torkhunov, S. F. (author)
Power Technology and Engineering ; 45 ; 305-308
2011-11-01
4 pages
Article (Journal)
Electronic Resource
English
Development and operation of unit 3 at the Kashira GRÉS
Online Contents | 2012
|British Library Online Contents | 1992