A platform for research: civil engineering, architecture and urbanism
Evaluation Readiness of Contractor and Government in Implementing the Road Preservation Program: Case Study National Road in Indonesia
The implementation of the road preservation program in Indonesia has been regulated by the Ministry of Public Works and Public Housing to ensure that road infrastructure can carry out its role properly to improve Indonesia’s social and economic mobility. The implementation of the road preservation program is very dependent on the stakeholders who carry it out. The performance indicators of contractors and government are the main things in achieving the quality of the output from implementing the road preservation program. The contractor’s performance and government’s performance were obtained from the distribution of questionnaires filled out with a total of 62 respondents. The results show that the readiness of the contractor to support the government is 80.65%, the attitude of the contractor is 93.55%, the understanding of the contractor is 90.32%, the financial aspect is 93.54%, and the accuracy of the schedule is 80.65% of the implementation performance—road preservation program. Meanwhile, the government’s readiness for the application of technology was 35.48%, and the government’s attitude was 45.16% on the performance of the road preservation program implementation and all the hypotheses are accepted.
Evaluation Readiness of Contractor and Government in Implementing the Road Preservation Program: Case Study National Road in Indonesia
The implementation of the road preservation program in Indonesia has been regulated by the Ministry of Public Works and Public Housing to ensure that road infrastructure can carry out its role properly to improve Indonesia’s social and economic mobility. The implementation of the road preservation program is very dependent on the stakeholders who carry it out. The performance indicators of contractors and government are the main things in achieving the quality of the output from implementing the road preservation program. The contractor’s performance and government’s performance were obtained from the distribution of questionnaires filled out with a total of 62 respondents. The results show that the readiness of the contractor to support the government is 80.65%, the attitude of the contractor is 93.55%, the understanding of the contractor is 90.32%, the financial aspect is 93.54%, and the accuracy of the schedule is 80.65% of the implementation performance—road preservation program. Meanwhile, the government’s readiness for the application of technology was 35.48%, and the government’s attitude was 45.16% on the performance of the road preservation program implementation and all the hypotheses are accepted.
Evaluation Readiness of Contractor and Government in Implementing the Road Preservation Program: Case Study National Road in Indonesia
Lecture Notes in Civil Engineering
Lie, Han Ay (editor) / Sutrisna, Monty (editor) / Prasetijo, Joewono (editor) / Hadikusumo, Bonaventura H.W. (editor) / Putranto, Leksmono Suryo (editor) / Umar, Maharani Pasha (author) / Rarasati, Ayomi Dita (author) / Sumabrata, R. Jachrizal (author)
2022-02-01
14 pages
Article/Chapter (Book)
Electronic Resource
English
The contractor in Iowa's soil stabilized road program
TIBKAT | 1951
|Development of local materials aids road contractor
Engineering Index Backfile | 1920
Offshore contractor wins Forth Road Bridge strengthening contract
Online Contents | 1994