A platform for research: civil engineering, architecture and urbanism
Chamber Opening Under Pressure Technology of Shield
In the process of shield tunnel construction, especially in the upper soft and lower hard composite stratum, Boulder stratum, sand pebble stratum, and other strata, due to the change of geological conditions and the influence of underground obstacles, the tool wear and damage often occur, which requires frequent chamber opening under pressure for tool inspection and replacement. However, it is very difficult and risky to open the chamber of shield under pressure, so strict control and management must be carried out to reduce the construction risk.
Chamber Opening Under Pressure Technology of Shield
In the process of shield tunnel construction, especially in the upper soft and lower hard composite stratum, Boulder stratum, sand pebble stratum, and other strata, due to the change of geological conditions and the influence of underground obstacles, the tool wear and damage often occur, which requires frequent chamber opening under pressure for tool inspection and replacement. However, it is very difficult and risky to open the chamber of shield under pressure, so strict control and management must be carried out to reduce the construction risk.
Chamber Opening Under Pressure Technology of Shield
Key Technologies for tunn. Construction under Complex Geological and Environmental Conditions
Hong, Kairong (editor) / Wang, Baiquan (author) / Zhang, Hongda (author) / Li, Dawei (author) / Li, Fengguo (author)
2021-07-11
28 pages
Article/Chapter (Book)
Electronic Resource
English
Chamber Pressure Optimization for Shield Tunneling
ASCE | 2018
|Shield under-pressure bin opening method for highly breathable water-permeable stratum
European Patent Office | 2020
|Method of Calculating Chamber Earth Pressure of EPB Shield
Trans Tech Publications | 2014
|Method of Calculating Chamber Earth Pressure of EPB Shield
Tema Archive | 2014
|