A platform for research: civil engineering, architecture and urbanism
Twelve years’ experience of successful adoption and operation of E-820 circular-furnace boiler
The design of the E-820 boiler and the way it was installed at the Novo-Irkutsk CHP Plant are described. Test data for the boiler fired with different types of coal are analyzed. Based on the long-term experience of successful operation of the boiler, recommendations are formulated on the use of circular-furnace boilers at new large power units and installing them in the existing boiler bays instead of overage boilers.
Twelve years’ experience of successful adoption and operation of E-820 circular-furnace boiler
The design of the E-820 boiler and the way it was installed at the Novo-Irkutsk CHP Plant are described. Test data for the boiler fired with different types of coal are analyzed. Based on the long-term experience of successful operation of the boiler, recommendations are formulated on the use of circular-furnace boilers at new large power units and installing them in the existing boiler bays instead of overage boilers.
Twelve years’ experience of successful adoption and operation of E-820 circular-furnace boiler
Gubanov, R. V. (author) / Poloskov, V. A. (author) / Sennov, V. P. (author) / Serant, F. A. (author)
Power Technology and Engineering ; 47 ; 50-53
2013-05-01
4 pages
Article (Journal)
Electronic Resource
English
Twelve years’ experience of successful adoption and operation of E-820 circular-furnace boiler
Online Contents | 2013
|Twelve years’ experience of successful adoption and operation of E-820 circular-furnace boiler
Online Contents | 2013
|Twelve years' experience in effective administration of resuscitation
Engineering Index Backfile | 1935
|Boiler furnace performance criteria
TIBKAT | 1963
Five Years of Successful Light Rail Operation
British Library Online Contents | 1992
|