A platform for research: civil engineering, architecture and urbanism
Underwater Concreting of the Derivational Channel of Chiryurt Hpp-1
Abrief information about Chiryurt hydroelectric station located in the Republic of Dagestan is presented. The complex value of the derivation channel of Chiryurt Hydro Power Plant (HPP)-1 for the Republic and the problems of its operation at the present time are described in detail. A comparative assessment of various options for canal reconstruction is given, considering the need for the operation of the waterworks during reconstruction and the minimization of social tension risks in the region. The conclusion is made about the optimal variant of reconstruction that provides a reliable and safe operation of the hydroelectric station.
Underwater Concreting of the Derivational Channel of Chiryurt Hpp-1
Abrief information about Chiryurt hydroelectric station located in the Republic of Dagestan is presented. The complex value of the derivation channel of Chiryurt Hydro Power Plant (HPP)-1 for the Republic and the problems of its operation at the present time are described in detail. A comparative assessment of various options for canal reconstruction is given, considering the need for the operation of the waterworks during reconstruction and the minimization of social tension risks in the region. The conclusion is made about the optimal variant of reconstruction that provides a reliable and safe operation of the hydroelectric station.
Underwater Concreting of the Derivational Channel of Chiryurt Hpp-1
Power Technol Eng
Purgin, K. V. (author) / Sretenskiy, A. V. (author) / Antropkin, V. V. (author)
Power Technology and Engineering ; 54 ; 41-43
2020-05-01
3 pages
Article (Journal)
Electronic Resource
English
Underwater Concreting of the Derivational Channel of Chiryurt Hpp-1
Online Contents | 2020
|TIBKAT | 1996
NTIS | 1990
Underwater Concreting (Reannouncement)
NTIS | 1990
Underwater concreting and repair
TIBKAT | 1994
|