A platform for research: civil engineering, architecture and urbanism
BIM Coordination Oriented to Facility Management
Abstract BIM coordination is an iterative process that requires an accurate roadmap to adequately manage the exchange of information, overcome communication barriers, improve the decision-making environment and guarantee a successful and collaborative work throughout the project’s lifecycle. Although the actual coordination practice satisfies the requirement of routing the whole systems in a proper way, it presents a lack of sequential, constructability, operation and maintenance issues. In order to contribute to the BIM coordination process knowledge, this paper introduces a coordination methodology that is based on the sequential approach and includes O&M (Operation and Maintenance) criteria. Regarding the previous idea, the project information should be organized in a coordination matrix that adds accessibility, functionality and installation requirements to each discipline. This proposal guarantees that the maintenance criteria and physical constraints are consistently meet, preserving a continuous flow and identifying wastes, delays, rework and cost overruns from the first stages of the buildings lifecycle. The suggested methodology aims to generate a more efficient coordination process which ensures that all efforts are headed in the right direction. As a result, the coordinated model will become the As-Built one.
BIM Coordination Oriented to Facility Management
Abstract BIM coordination is an iterative process that requires an accurate roadmap to adequately manage the exchange of information, overcome communication barriers, improve the decision-making environment and guarantee a successful and collaborative work throughout the project’s lifecycle. Although the actual coordination practice satisfies the requirement of routing the whole systems in a proper way, it presents a lack of sequential, constructability, operation and maintenance issues. In order to contribute to the BIM coordination process knowledge, this paper introduces a coordination methodology that is based on the sequential approach and includes O&M (Operation and Maintenance) criteria. Regarding the previous idea, the project information should be organized in a coordination matrix that adds accessibility, functionality and installation requirements to each discipline. This proposal guarantees that the maintenance criteria and physical constraints are consistently meet, preserving a continuous flow and identifying wastes, delays, rework and cost overruns from the first stages of the buildings lifecycle. The suggested methodology aims to generate a more efficient coordination process which ensures that all efforts are headed in the right direction. As a result, the coordinated model will become the As-Built one.
BIM Coordination Oriented to Facility Management
Sierra-Aparicio, Mónica Viviana (author) / Ponz-Tienda, José Luis (author) / Romero-Cortés, Juan Pablo (author)
2018-10-04
6 pages
Article/Chapter (Book)
Electronic Resource
English
Building information modeling (BIM) , Coordination , Facility management Engineering , Building Construction and Design , Data Mining and Knowledge Discovery , Building Repair and Maintenance , Computer-Aided Engineering (CAD, CAE) and Design , Light Construction, Steel Construction, Timber Construction , Construction Management
A service-oriented perspective of facility management
Emerald Group Publishing | 2014
|An object-oriented model to support healthcare facility information management
Online Contents | 2013
|An object-oriented model to support healthcare facility information management
British Library Online Contents | 2013
|