A platform for research: civil engineering, architecture and urbanism
Development and operation of unit 3 at the Kashira GRÉS
Initial results on the development and operation of the 330 MW pulverized-coal fired unit at the Kashira GRÉS are reported. The major performance indices are close to the design values. The remaining unsolved issues are singled out.
Development and operation of unit 3 at the Kashira GRÉS
Initial results on the development and operation of the 330 MW pulverized-coal fired unit at the Kashira GRÉS are reported. The major performance indices are close to the design values. The remaining unsolved issues are singled out.
Development and operation of unit 3 at the Kashira GRÉS
Torkhunov, S. F. (author) / Shvarts, A. L. (author) / Avrutsky, G. D. (author) / Verbovetskii, E. Kh. (author) / Boksha, A. K. (author) / Vereshchitin, V. A. (author) / Somov, A. A. (author) / Chugreev, A. A. (author)
Power Technology and Engineering ; 46 ; 289-297
2012-11-01
9 pages
Article (Journal)
Electronic Resource
English
Development and operation of unit 3 at the Kashira GRÉS
Online Contents | 2012
|Development and operation of unit 3 at the Kashira GRÉS
Online Contents | 2012
|British Library Online Contents | 1992
Une nouvelle construction en Grès
DataCite | 1903
|