A platform for research: civil engineering, architecture and urbanism
Experience in reconstructing the structures and equipment at the Lower Tuloma hydroelectric station
Conclusion Reconstruction will make it possible to provide reliable, trouble-free operation of the hydrostation; to reliably service the mechanical equipment operating underwater; to minimize diving operations when placing stop logs and cleaning the trash racks and will considerably accelerate them, which ultimately will make it possible to increase the generation of electricity.
Experience in reconstructing the structures and equipment at the Lower Tuloma hydroelectric station
Conclusion Reconstruction will make it possible to provide reliable, trouble-free operation of the hydrostation; to reliably service the mechanical equipment operating underwater; to minimize diving operations when placing stop logs and cleaning the trash racks and will considerably accelerate them, which ultimately will make it possible to increase the generation of electricity.
Experience in reconstructing the structures and equipment at the Lower Tuloma hydroelectric station
Spitsyn, V. E. (author)
Hydrotechnical Construction ; 30 ; 271-273
1996-05-01
3 pages
Article (Journal)
Electronic Resource
English
Experience in reconstructing the structures and equipment at the Lower Tuloma hydroelectric station
Online Contents | 1996
|Experience in Reconstructing the Structures and Equipment at the Lower Tuloma Hydroelectric Station
British Library Online Contents | 1996
|10 years of operation of the Upper Tuloma hydroelectric plant
Springer Verlag | 1975
|Experience in Reconstructing the Runner at the Dnepr Hydroelectric Station
British Library Online Contents | 1997
|Experience in reconstructing the runner at the Dnepr hydroelectric station
Online Contents | 1997
|