A platform for research: civil engineering, architecture and urbanism
Application of the Decision Aids for Tunneling (DAT) to update excavation cost/time information
The Decision Aids for Tunneling (DAT) is a computer based tool with which one can obtain distributions of the tunnel constructin cost and time considering uncertainties of the geology and construction process for a given tunnel. As construction progresses, geologic information is checked based on the excavated part of the tunnel and, therefore, the uncertainty about this part of the tunnel will disappears. This new information can be used to update the geology of the tunnel in order to obtain more precise prediction during construction. In this paper, the new study on the application of the DAT to update the geology of the given tunnel is introduced. DAT simulation is updated based on face-mapping data and two approaches are used for the geologic updating of the given tunnel. The results of simulations for the initial prediction and the updated prediction will be compared in order to see how the construction time and cost distributions of the given tunnel are changed after the geologic updating.
Application of the Decision Aids for Tunneling (DAT) to update excavation cost/time information
The Decision Aids for Tunneling (DAT) is a computer based tool with which one can obtain distributions of the tunnel constructin cost and time considering uncertainties of the geology and construction process for a given tunnel. As construction progresses, geologic information is checked based on the excavated part of the tunnel and, therefore, the uncertainty about this part of the tunnel will disappears. This new information can be used to update the geology of the tunnel in order to obtain more precise prediction during construction. In this paper, the new study on the application of the DAT to update the geology of the given tunnel is introduced. DAT simulation is updated based on face-mapping data and two approaches are used for the geologic updating of the given tunnel. The results of simulations for the initial prediction and the updated prediction will be compared in order to see how the construction time and cost distributions of the given tunnel are changed after the geologic updating.
Application of the Decision Aids for Tunneling (DAT) to update excavation cost/time information
KSCE J Civ Eng
Min, S. Y. (author) / Einstein, H. H. (author) / Lee, J. S. (author) / Lee, H. S. (author)
KSCE Journal of Civil Engineering ; 9 ; 335-346
2005-07-01
12 pages
Article (Journal)
Electronic Resource
English
Decision Aids for Tunneling: Update
British Library Online Contents | 2004
|Excavation materials handling in the Loetschberg Base Tunnel using Decision Aids for Tunneling (DAT)
DSpace@MIT | 2002
|British Library Conference Proceedings | 1999
|ASCE | 2018
|Updating the Decision Aids for Tunneling
Online Contents | 2002
|