A platform for research: civil engineering, architecture and urbanism
Workflow for Pump House Design Using Building Information Modeling
The workflow for pump house design using Building Information Modeling is discussed in this study. Collaboration with interdisciplinary models such as the pump house’s architectural, structural, mechanical, electrical, and plumbing systems is a significant part of this workflow. The workflow has been illustrated using a flowchart diagram to explain how BIM models from each discipline will be started, shared, and delivered at each level. Shared model includes design and creation of MEP model. Clash rendition is to be shared and checked against architectural clash rendition. Information exchange to be checked and documentation is carried out for stage completion. Approved and shared design deliverables are released for the documentation purpose. The detection of clashes is an important aspect of the integrated BIM modeling process. Create a complete master model that incorporates design models from various engineering disciplines. When different models are created for each discipline, there is a significant possibility of clashes. Individual disciplines can operate simultaneously and independently of one another. The Clash Detection Matrix was created to investigate and eliminate collisions between various disciplines during the preliminary and final stages of design.
Workflow for Pump House Design Using Building Information Modeling
The workflow for pump house design using Building Information Modeling is discussed in this study. Collaboration with interdisciplinary models such as the pump house’s architectural, structural, mechanical, electrical, and plumbing systems is a significant part of this workflow. The workflow has been illustrated using a flowchart diagram to explain how BIM models from each discipline will be started, shared, and delivered at each level. Shared model includes design and creation of MEP model. Clash rendition is to be shared and checked against architectural clash rendition. Information exchange to be checked and documentation is carried out for stage completion. Approved and shared design deliverables are released for the documentation purpose. The detection of clashes is an important aspect of the integrated BIM modeling process. Create a complete master model that incorporates design models from various engineering disciplines. When different models are created for each discipline, there is a significant possibility of clashes. Individual disciplines can operate simultaneously and independently of one another. The Clash Detection Matrix was created to investigate and eliminate collisions between various disciplines during the preliminary and final stages of design.
Workflow for Pump House Design Using Building Information Modeling
Lecture Notes in Civil Engineering
Reddy, Krishna R. (editor) / Ravichandran, P. T. (editor) / Ayothiraman, R. (editor) / Joseph, Anil (editor) / Kavitha, R. (author) / Ram Vivekananthan, M. (author) / Vinodhini, C. (author) / Abhinesh, K. (author) / Srinivasan, S. (author) / Monishkumar, R. (author)
International Conference on Civil Engineering Innovative Development in Engineering Advances ; 2023 ; Kattankulathur, India
2024-01-31
8 pages
Article/Chapter (Book)
Electronic Resource
English
Applicability of Building Information Modelling (BIM) to Structural Design Workflow
Springer Verlag | 2024
|