A platform for research: civil engineering, architecture and urbanism
Integral labor costs for substantiation of hydropower construction alternatives
Conclusions 1. The performed investigation showed that the evaluation of power construction alternatives and the substantiation of the parameters of hydraulic developments with the aid of the current methods of economic analysis and with direct comparison of the labor in man-days may lead to different conclusions with respect to the comparative effectiveness of the examined alternatives and the most advisable parameters of the hydraulic developments. 2. Under the conditions of the increasing strain in the labor balance, it is advisable to continue to improve the existing methods of evaluation of the effectiveness of power construction alternatives in the direction of taking into account the live labor. The problem of improving these methods is highly topical for construction of hydropower projects in connection with the great difference which ordinarily occurs in the quantity of the enlisted labor resources in the hydroelectric plant construction alternative and in the other alternatives.
Integral labor costs for substantiation of hydropower construction alternatives
Conclusions 1. The performed investigation showed that the evaluation of power construction alternatives and the substantiation of the parameters of hydraulic developments with the aid of the current methods of economic analysis and with direct comparison of the labor in man-days may lead to different conclusions with respect to the comparative effectiveness of the examined alternatives and the most advisable parameters of the hydraulic developments. 2. Under the conditions of the increasing strain in the labor balance, it is advisable to continue to improve the existing methods of evaluation of the effectiveness of power construction alternatives in the direction of taking into account the live labor. The problem of improving these methods is highly topical for construction of hydropower projects in connection with the great difference which ordinarily occurs in the quantity of the enlisted labor resources in the hydroelectric plant construction alternative and in the other alternatives.
Integral labor costs for substantiation of hydropower construction alternatives
Érlikhman, B. L. (author)
Hydrotechnical Construction ; 14 ; 1130-1134
1980-11-01
5 pages
Article (Journal)
Electronic Resource
English
Integral labor costs for substantiation of hydropower construction alternatives
Online Contents | 1980
|Economic substantiation of hydropower construction
Springer Verlag | 1977
|Economic substantiation of hydropower construction
Online Contents | 1977
|Estimating labor costs on building construction
Engineering Index Backfile | 1922
|