A platform for research: civil engineering, architecture and urbanism
Reconstruction of the Northern Donets-Donbas canal
Conclusions 1. Stagewise reconstruction of open canals can be accomplished under conditions of their uninterrupted operation. 2. An increase of the capacity of existing canals by reconstructing their structures and channel is an economically expedient measure competing with other variants of supplying water to large industrial regions.
Reconstruction of the Northern Donets-Donbas canal
Conclusions 1. Stagewise reconstruction of open canals can be accomplished under conditions of their uninterrupted operation. 2. An increase of the capacity of existing canals by reconstructing their structures and channel is an economically expedient measure competing with other variants of supplying water to large industrial regions.
Reconstruction of the Northern Donets-Donbas canal
Zhuk, G. P. (author) / Osadchuk, V. A. (author)
Hydrotechnical Construction ; 14 ; 765-772
1980-08-01
8 pages
Article (Journal)
Electronic Resource
English
Reconstruction of the Northern Donets-Donbas canal
Online Contents | 1980
|Start-up hydraulic tests on the northern Donets-Donbas Canal
Online Contents | 1979
|Start-up hydraulic tests on the northern Donets-Donbas Canal
Springer Verlag | 1979
|Full-scale measurements of the roughness factor of the Seversk Donets-Donbas canal
Springer Verlag | 1972
|Full-scale measurements of the roughness factor of the Seversk Donets-Donbas canal
Online Contents | 1972
|