A platform for research: civil engineering, architecture and urbanism
Analysing Cost Overrun in Building a Construction Project Using Building Information Modeling
The growth of construction projects and technology in Indonesia is very rapid in the implementation process which has resulted in several innovations. One of the innovation models in construction modeling is building information modeling (BIM). Meanwhile, in implementing a construction project, there is often cost overrun and delays. This paper aims to analyze the causes of cost overrun in building construction projects in the construction phase using BIM. A structural equation model (SEM) method with a smart partial least square tool was used to analyze what causes and influences cost overrun that can be tackled by BIM. The factors that influence cost overrun are the high frequency of change in the construction phase, schedule delays, inadequate control and monitoring, poor finance control in the field, inadequate supervisor placement and qualifications, shipping delays, inadequate equipment, a lack of material, and poor management and supervision at the site. This paper contributes to project managers and project teams to know what factors influence cost overrun in building a construction project.
Analysing Cost Overrun in Building a Construction Project Using Building Information Modeling
The growth of construction projects and technology in Indonesia is very rapid in the implementation process which has resulted in several innovations. One of the innovation models in construction modeling is building information modeling (BIM). Meanwhile, in implementing a construction project, there is often cost overrun and delays. This paper aims to analyze the causes of cost overrun in building construction projects in the construction phase using BIM. A structural equation model (SEM) method with a smart partial least square tool was used to analyze what causes and influences cost overrun that can be tackled by BIM. The factors that influence cost overrun are the high frequency of change in the construction phase, schedule delays, inadequate control and monitoring, poor finance control in the field, inadequate supervisor placement and qualifications, shipping delays, inadequate equipment, a lack of material, and poor management and supervision at the site. This paper contributes to project managers and project teams to know what factors influence cost overrun in building a construction project.
Analysing Cost Overrun in Building a Construction Project Using Building Information Modeling
Lect. Notes in Networks, Syst.
Bushuyev, Sergey (editor) / Ding, Ronggui (editor) / Radujkovic, Mladen (editor) / Sihombing, Lukas Beladi (author) / Baskoro, Ari Tiandaru (author)
World Congress of the International Project Management Association ; 2021 ; St. Petersburg, Russia
2023-06-17
18 pages
Article/Chapter (Book)
Electronic Resource
English
Revolutionizing steel building project cost overrun risk assessment by Bayesian network
Emerald Group Publishing | 2024
|