Modeling Manpower and Equipment Productivity in Tall Building Construction Projects
Abstract Tall building construction projects involve two critical resources of manpower and equipment. Their usage, however, widely varies due to several factors affecting their productivity. Currently, no systematic study for estimating and increasing their productivity is available. What is prevalent is the use of empirical data, experience of similar projects and assumptions. As tall building projects are here to stay and increase, to meet the emerging demands in ever shrinking urban spaces, it is imperative to explore ways and means of scientific productivity models for basic construction activities: concrete, reinforcement, formwork, block work and plastering for the input of specific resources in a mixed environment of manpower and equipment usage. Data pertaining to 72 tall building projects in India were collected and analyzed. Then, suitable productivity estimation models were developed using multiple linear regression analysis and validated using independent field data. It is hoped that the models developed in the study will be useful for quantity surveyors, cost engineers and project managers to estimate productivity of resources in tall building projects.
Modeling Manpower and Equipment Productivity in Tall Building Construction Projects
Abstract Tall building construction projects involve two critical resources of manpower and equipment. Their usage, however, widely varies due to several factors affecting their productivity. Currently, no systematic study for estimating and increasing their productivity is available. What is prevalent is the use of empirical data, experience of similar projects and assumptions. As tall building projects are here to stay and increase, to meet the emerging demands in ever shrinking urban spaces, it is imperative to explore ways and means of scientific productivity models for basic construction activities: concrete, reinforcement, formwork, block work and plastering for the input of specific resources in a mixed environment of manpower and equipment usage. Data pertaining to 72 tall building projects in India were collected and analyzed. Then, suitable productivity estimation models were developed using multiple linear regression analysis and validated using independent field data. It is hoped that the models developed in the study will be useful for quantity surveyors, cost engineers and project managers to estimate productivity of resources in tall building projects.
Modeling Manpower and Equipment Productivity in Tall Building Construction Projects
Mudumbai Krishnaswamy, Parthasarathy (author) / Rajiah, Murugasan (author) / Vasan, Ramya (author)
Journal of The Institution of Engineers (India): Series A ; 98 ; 493-499
2017-11-02
7 pages
Article (Journal)
Electronic Resource
English
Modeling labor productivity in high-rise building construction projects using neural networks
DOAJ | 2023
|Case-based allocation of onsite supervisory manpower for construction projects
British Library Online Contents | 2008
|Case-based allocation of onsite supervisory manpower for construction projects
Online Contents | 2008
|