A platform for research: civil engineering, architecture and urbanism
Implementation Tools for Projects Cost Benefit Analysis (CBA)
The paper focus on the integration between digitalization technologies and evaluation tools. in particular how Building information Modeling (BIM) and the Geographic Information System (GIS) can be integrated to support Cost-Benefit Analysis in the first step of the project evaluation process as set forth in the National Recovery and Resilience Plan (PNRR) and the Guidelines for the project’s technical and economic feasibility issued by the Italian Ministry of infrastructure and sustainable mobility (MIMS). BIM and GIS, along with BIM plug-ins to be further developed, provide useful tools to the calculation of NPV as requested in the above guidelines.
Implementation Tools for Projects Cost Benefit Analysis (CBA)
The paper focus on the integration between digitalization technologies and evaluation tools. in particular how Building information Modeling (BIM) and the Geographic Information System (GIS) can be integrated to support Cost-Benefit Analysis in the first step of the project evaluation process as set forth in the National Recovery and Resilience Plan (PNRR) and the Guidelines for the project’s technical and economic feasibility issued by the Italian Ministry of infrastructure and sustainable mobility (MIMS). BIM and GIS, along with BIM plug-ins to be further developed, provide useful tools to the calculation of NPV as requested in the above guidelines.
Implementation Tools for Projects Cost Benefit Analysis (CBA)
Lect. Notes in Networks, Syst.
Calabrò, Francesco (editor) / Della Spina, Lucia (editor) / Piñeira Mantiñán, María José (editor) / Acampa, Giovanna (author) / Marino, Giorgia (author)
INTERNATIONAL SYMPOSIUM: New Metropolitan Perspectives ; 2022 ; Reggio Calabria, Italy
2022-08-25
8 pages
Article/Chapter (Book)
Electronic Resource
English
Cost-Benefit Analysis for Accident Prevention in Construction Projects
British Library Online Contents | 2012
|Cost-Benefit Analysis for Accident Prevention in Construction Projects
Online Contents | 2012
|Cost–benefit analyses of radon mitigation projects
Online Contents | 2006
|