Identification and Analysis of Factors of Delay in Road Construction Projects
Delays are frequent in any civil engineering projects including the road projects. Project delays can result in cost overrun, time overruns, quality issues, etc. In this study, a national highway road project has been considered. A total of probable 90 delay factors were recognized and were characterized into nine foremost categories. A questionnaire was prepared, and it was filled by 101 respondents. Relative importance index technique has been used for the analysis of questionnaire data. The top and base 15 delay factors were recognized. The top five delay factors were found to be: consequence of sub-surface circumstances (rock, water table, soil, etc.), design related clashes/faults, provide the furnished site to the contractor, scarcity of skilled labour, resource allocation related delay, etc.
Identification and Analysis of Factors of Delay in Road Construction Projects
Delays are frequent in any civil engineering projects including the road projects. Project delays can result in cost overrun, time overruns, quality issues, etc. In this study, a national highway road project has been considered. A total of probable 90 delay factors were recognized and were characterized into nine foremost categories. A questionnaire was prepared, and it was filled by 101 respondents. Relative importance index technique has been used for the analysis of questionnaire data. The top and base 15 delay factors were recognized. The top five delay factors were found to be: consequence of sub-surface circumstances (rock, water table, soil, etc.), design related clashes/faults, provide the furnished site to the contractor, scarcity of skilled labour, resource allocation related delay, etc.
Identification and Analysis of Factors of Delay in Road Construction Projects
Lecture Notes in Civil Engineering
Agnihotri, Arvind Kumar (editor) / Reddy, Krishna R. (editor) / Chore, H. S. (editor) / Shukla, Bishnu Kant (author) / Bansal, Vaishnavi (author) / Varadharajan, S. (author) / Bharti, Gaurav (author) / Shenoy, Aparupa (author) / Singh, Udit Kumar (author) / Kirthanashri, S. V. (author)
Indian Geotechnical and Geoenvironmental Engineering Conference ; 2021
2022-11-24
7 pages
Article/Chapter (Book)
Electronic Resource
English
Causes of Delay in Road Construction Projects
Online Contents | 2012
|Risk matrix for factors affecting time delay in road construction projects: owners' perspective
Online Contents | 2011
|Risk matrix for factors affecting time delay in road construction projects: owners' perspective
Emerald Group Publishing | 2011
|Risk Matrix for Factors Affecting Time Delay in Road Construction Projects: Consultants' Perspective
British Library Conference Proceedings | 2012
|