A platform for research: civil engineering, architecture and urbanism
Behavior of bolted circular flange connections subject to tensile loading
This paper presents the tensile behavior of bolted circular flange connections that represent typical connectivity of leg members in a steel guyed lattice communication tower. A total of twelve specimens have been tested to failure under increasing monotonic tension. Each test specimen consists of a pair of circular flange plates (Φ178 mm), where each plate is welded to a solid circular bar. The flanges are bolted back-to-back using two high-strength bolts located 180º apart. The focus of the experiment includes the development of gaps between the upper and lower flanges connected with ASTM A325 bolts (Φ16 mm), increase in bolt forces, and prying action. The development of gaps between the flanges is significantly influenced by the size of leg members. The increase in the bolt force at failure is approximately 40%, relative to the initial preload of 110 kN. The maximum prying force is observed at the preload level and the prying force decreases gradually as the flanges are further loaded, indicating a complete separation of the upper and lower flanges. The widely used T-stub design equations conservatively predict the behavior of bolted circular flange connections. The proposed predictive equations agree well with the test data, especially near the failure of the bolts.
Behavior of bolted circular flange connections subject to tensile loading
This paper presents the tensile behavior of bolted circular flange connections that represent typical connectivity of leg members in a steel guyed lattice communication tower. A total of twelve specimens have been tested to failure under increasing monotonic tension. Each test specimen consists of a pair of circular flange plates (Φ178 mm), where each plate is welded to a solid circular bar. The flanges are bolted back-to-back using two high-strength bolts located 180º apart. The focus of the experiment includes the development of gaps between the upper and lower flanges connected with ASTM A325 bolts (Φ16 mm), increase in bolt forces, and prying action. The development of gaps between the flanges is significantly influenced by the size of leg members. The increase in the bolt force at failure is approximately 40%, relative to the initial preload of 110 kN. The maximum prying force is observed at the preload level and the prying force decreases gradually as the flanges are further loaded, indicating a complete separation of the upper and lower flanges. The widely used T-stub design equations conservatively predict the behavior of bolted circular flange connections. The proposed predictive equations agree well with the test data, especially near the failure of the bolts.
Behavior of bolted circular flange connections subject to tensile loading
Int J Steel Struct
Kim, Yail J. (author) / Madugula, Murty K. S. (author)
International Journal of Steel Structures ; 10 ; 65-71
2010-03-01
7 pages
Article (Journal)
Electronic Resource
English
Tensile resistances of bolted circular flange connections
Elsevier | 2018
|Numerical models for bolted RHS flange-plate connections under tensile loading
British Library Conference Proceedings | 2003
|Prying action in bolted steel circular flange connections
Online Contents | 2006
|Prying action in bolted steel circular flange connections
British Library Online Contents | 2006
|Inelastic Behavior of Bolted Flange Plate Connections
British Library Online Contents | 2002
|