A platform for research: civil engineering, architecture and urbanism
Case study on pile running during the driving process of large-diameter pipe piles
The super-long and large-diameter steel pipe piles are often adopted for the construction of offshore oil platforms in deep sea. One constructability issue related to driving heavy pipe piles is the pile running. The term pile running refers to the quick penetration of a pile into the seabed as a result of its high self-weight and low resistance from the seabed. The unexpected pile running can cause the steel wire of the hammer to break or even the loss of the hammer. A case study of pile running at an oil platform is introduced in this paper. A simplified theoretical method is proposed to explain the mechanisms of the pile running in this case. A factor of friction degradation is proposed to calculate the dynamic skin friction from the static ultimate skin friction of surrounding soil. The comparisons between the predictions to the case history show that the proposed simplified method can be used to predict the pile running condition.
Case study on pile running during the driving process of large-diameter pipe piles
The super-long and large-diameter steel pipe piles are often adopted for the construction of offshore oil platforms in deep sea. One constructability issue related to driving heavy pipe piles is the pile running. The term pile running refers to the quick penetration of a pile into the seabed as a result of its high self-weight and low resistance from the seabed. The unexpected pile running can cause the steel wire of the hammer to break or even the loss of the hammer. A case study of pile running at an oil platform is introduced in this paper. A simplified theoretical method is proposed to explain the mechanisms of the pile running in this case. A factor of friction degradation is proposed to calculate the dynamic skin friction from the static ultimate skin friction of surrounding soil. The comparisons between the predictions to the case history show that the proposed simplified method can be used to predict the pile running condition.
Case study on pile running during the driving process of large-diameter pipe piles
Sun, Liqiang (author) / Wang, Yandi (author) / Guo, Wei (author) / Yan, Shuwang (author) / Chu, Jian (author) / Liu, Xiaoqiang (author)
Marine Georesources & Geotechnology ; 36 ; 709-721
2018-08-18
13 pages
Article (Journal)
Electronic Resource
English
CPTU , pile driven , pile running , pipe pile
Driving behavior of large diameter steel pipe piles
British Library Conference Proceedings | 2000
|British Library Conference Proceedings | 2002
|Axial Pile Capacity of Large Diameter Cylinder Piles
British Library Conference Proceedings | 2008
|