A platform for research: civil engineering, architecture and urbanism
Quantifying moisture damage at mastic–aggregate interface
This study quantifies moisture damage at the asphalt mastic–aggregate interfaces using finite element method modelling technique in ABAQUS. A model aggregate surrounded by a layer of mastic is subjected to static loads of varying magnitudes and patterns. Using dynamic shear and elastic moduli of wet and dry mastic and aggregate as model inputs, moisture-induced damage is quantified through parameters such as contact stresses at interface, load to initiate damage and de-bonding at the interface. Results show that contact stresses are significantly higher in dry samples than wet samples. It is revealed that damage initiates at a smaller magnitude of deformation (0.0508 mm) in the wet sample than that (0.508 mm) in the dry sample. That is, a stiffer dry sample carries more loads and deforms less before damage initiation than a softer wet sample. In addition, approximately 6.8% interface de-bonding occurs in the dry sample, whereas 49.1% de-bonding occurs in the wet sample.
Quantifying moisture damage at mastic–aggregate interface
This study quantifies moisture damage at the asphalt mastic–aggregate interfaces using finite element method modelling technique in ABAQUS. A model aggregate surrounded by a layer of mastic is subjected to static loads of varying magnitudes and patterns. Using dynamic shear and elastic moduli of wet and dry mastic and aggregate as model inputs, moisture-induced damage is quantified through parameters such as contact stresses at interface, load to initiate damage and de-bonding at the interface. Results show that contact stresses are significantly higher in dry samples than wet samples. It is revealed that damage initiates at a smaller magnitude of deformation (0.0508 mm) in the wet sample than that (0.508 mm) in the dry sample. That is, a stiffer dry sample carries more loads and deforms less before damage initiation than a softer wet sample. In addition, approximately 6.8% interface de-bonding occurs in the dry sample, whereas 49.1% de-bonding occurs in the wet sample.
Quantifying moisture damage at mastic–aggregate interface
Hossain, Mohammad I. (author) / Tarefder, Rafiqul A. (author)
International Journal of Pavement Engineering ; 15 ; 174-189
2014-02-07
16 pages
Article (Journal)
Electronic Resource
English
British Library Conference Proceedings | 2007
|Moisture-induced strength degradation of aggregate–asphalt mastic bonds
Taylor & Francis Verlag | 2014
|Moisture-induced strength degradation of aggregate-asphalt mastic bonds
British Library Online Contents | 2014
|Determination of Bond Strength as a Function of Moisture Content at the Aggregate-Mastic Interface
British Library Conference Proceedings | 2006
|Quantifying moisture damage at masticaggregate interface
Online Contents | 2014
|