A platform for research: civil engineering, architecture and urbanism
Unpacking construction site digitalization: the role of incongruence and inconsistency in technological frames
Construction site operations often involve multiple actors with substantial variations in assumptions, expectations, and knowledge about technology. This could impair digitalization, which involves development of socio-cognitive environments that foster use of digital technology in new organizational procedures. Nevertheless, construction industry digitalization research has mainly addressed firm-level transformation of engineering phases and focused on technology, largely ignoring challenges arising from cognitive differences among actors at construction sites. Thus, we report a case study of attempts to spark construction site digitalization through a shared information management system (IMS). Applying technology frame of reference theory, we demonstrate how differences within groups among actors’ frames (inconsistency) shape group-level frame misalignment (incongruence) and thus digitalization outcomes. The IMS was implemented successfully at the focal firm’s headquarter and regional office levels. However, substantial construction site-level frame inconsistency led to misaligned group-level expectations and generated a fragmented socio-cognitive environment that hindered strategic digitalization. In conclusion, socio-cognitive environments at industry, construction site, and group levels recursively shape individual frames, and harmonization of frames is important to realize construction digitalization.
Unpacking construction site digitalization: the role of incongruence and inconsistency in technological frames
Construction site operations often involve multiple actors with substantial variations in assumptions, expectations, and knowledge about technology. This could impair digitalization, which involves development of socio-cognitive environments that foster use of digital technology in new organizational procedures. Nevertheless, construction industry digitalization research has mainly addressed firm-level transformation of engineering phases and focused on technology, largely ignoring challenges arising from cognitive differences among actors at construction sites. Thus, we report a case study of attempts to spark construction site digitalization through a shared information management system (IMS). Applying technology frame of reference theory, we demonstrate how differences within groups among actors’ frames (inconsistency) shape group-level frame misalignment (incongruence) and thus digitalization outcomes. The IMS was implemented successfully at the focal firm’s headquarter and regional office levels. However, substantial construction site-level frame inconsistency led to misaligned group-level expectations and generated a fragmented socio-cognitive environment that hindered strategic digitalization. In conclusion, socio-cognitive environments at industry, construction site, and group levels recursively shape individual frames, and harmonization of frames is important to realize construction digitalization.
Unpacking construction site digitalization: the role of incongruence and inconsistency in technological frames
Lundberg, Oscar (author) / Nylén, Daniel (author) / Sandberg, Johan (author)
Construction Management and Economics ; 40 ; 987-1002
2022-12-02
16 pages
Article (Journal)
Electronic Resource
Unknown
Unpacking construction site safety
TIBKAT | 2016
|Unpacking construction site safety
UB Braunschweig | 2016
|Levels of Digitalization for Construction Machinery on the Connected and Automated Construction Site
Springer Verlag | 2023
|