Strengthening and Widening of Steel Single Box Girder Bridge in Warsaw
Grota-Roweckiego Bridge is the busiest bridge in Poland with average daily traffic over 185 000 vehicles in 2017. The 646-m long bridge with main spans of 120 m was built in 1977–1981. The paper presents the design and realisation of the rebuild done in 2013–2015. Modernisation involved widening of two independent decks with braced cantilevers by total of more than 9 m and strengthening the structure by external prestressing. The design included increasing the load capacity of the bridge by using over 100 straight prestressed tendons on each of two superstructures. Special attention was paid to the estimation of the remaining fatigue life of the orthotropic deck. The procedure according to JRC-ECCS recommendations was applied, including fatigue tests of selected parts of the existing deck. The paper also presents technological aspects such as methods of assembling of steel structure, prestressing of the bridge and order of works. Particular attention has been devoted to unexpected behaviour of the structure, that is vibrations of the deck cantilevers near dilatation joints and pot bearing damage during laying of the asphalt pavement.
Strengthening and Widening of Steel Single Box Girder Bridge in Warsaw
Grota-Roweckiego Bridge is the busiest bridge in Poland with average daily traffic over 185 000 vehicles in 2017. The 646-m long bridge with main spans of 120 m was built in 1977–1981. The paper presents the design and realisation of the rebuild done in 2013–2015. Modernisation involved widening of two independent decks with braced cantilevers by total of more than 9 m and strengthening the structure by external prestressing. The design included increasing the load capacity of the bridge by using over 100 straight prestressed tendons on each of two superstructures. Special attention was paid to the estimation of the remaining fatigue life of the orthotropic deck. The procedure according to JRC-ECCS recommendations was applied, including fatigue tests of selected parts of the existing deck. The paper also presents technological aspects such as methods of assembling of steel structure, prestressing of the bridge and order of works. Particular attention has been devoted to unexpected behaviour of the structure, that is vibrations of the deck cantilevers near dilatation joints and pot bearing damage during laying of the asphalt pavement.
Strengthening and Widening of Steel Single Box Girder Bridge in Warsaw
Kasprzak, AndrzejPhD (author) / Berger, AndrzejPhD (author)
Structural Engineering International ; 29 ; 533-536
2019-10-02
4 pages
Article (Journal)
Electronic Resource
English
Bridge strengthening, widening and re-alignment
Engineering Index Backfile | 1932
|Unconventional method for bridge strengthening and widening
British Library Conference Proceedings | 2004
|Tamar Bridge strengthening & widening - a case study
British Library Conference Proceedings | 1999
|Widening and strengthening of Kingston Bridge, London
British Library Conference Proceedings | 2000
|Strengthening of a Steel Bridge Girder Using CFRP Plates
Online Contents | 2001
|