A risk allocation model among the elements of freeway projects in public-private partnership (PPP) method using integrated fuzzy multi-criteria decision-making techniques
In the present study, an appropriate risk assessment and allocation model was developed between the various elements of PPP based infrastructure projects. For this purpose, after a review of the research literature and identification of the most important risks, with a case study on PPP-based freeway projects in Iran, a systematic model for risk assessment using fuzzy MCDM methods including FAHP has developed in order to critical risk assessment (Objective 1), FTOPSIS Identification of Common Risks in PPP Transportation Projects (Objective 2) and FDEMATEL for Allocation and Impact of Risk Between Different Project Elements (Objective 3). The results of risk analysis by FAHP method showed that economic and financing, construction and operational risks have the greatest impact, respectively. In addition, the results of FTOPSIS method showed that projects Isfahan-Shiraz Freeway, Salafchegan-Arak Freeway and Khorramabad-Arak Freeway, respectively, were more affected by risks. Finally, the results of FDEMATEL analysis show the degree of interaction and impact strength of risks for each risk and from the perspective of each project manager, which indicates a significant relationship between different risks. The results of this research can be used as a management model in the process of evaluation and risk management of PPP projects.
A risk allocation model among the elements of freeway projects in public-private partnership (PPP) method using integrated fuzzy multi-criteria decision-making techniques
In the present study, an appropriate risk assessment and allocation model was developed between the various elements of PPP based infrastructure projects. For this purpose, after a review of the research literature and identification of the most important risks, with a case study on PPP-based freeway projects in Iran, a systematic model for risk assessment using fuzzy MCDM methods including FAHP has developed in order to critical risk assessment (Objective 1), FTOPSIS Identification of Common Risks in PPP Transportation Projects (Objective 2) and FDEMATEL for Allocation and Impact of Risk Between Different Project Elements (Objective 3). The results of risk analysis by FAHP method showed that economic and financing, construction and operational risks have the greatest impact, respectively. In addition, the results of FTOPSIS method showed that projects Isfahan-Shiraz Freeway, Salafchegan-Arak Freeway and Khorramabad-Arak Freeway, respectively, were more affected by risks. Finally, the results of FDEMATEL analysis show the degree of interaction and impact strength of risks for each risk and from the perspective of each project manager, which indicates a significant relationship between different risks. The results of this research can be used as a management model in the process of evaluation and risk management of PPP projects.
A risk allocation model among the elements of freeway projects in public-private partnership (PPP) method using integrated fuzzy multi-criteria decision-making techniques
Jokar, Ebrahim (author) / Aminnejad, Babak (author) / Lork, Alireza (author)
Australian Journal of Civil Engineering ; 21 ; 116-140
2023-01-02
25 pages
Article (Journal)
Electronic Resource
Unknown
Risk Allocation in Public-Private Partnership Infrastructure Projects: Comparative Study
Online Contents | 2010
|British Library Online Contents | 2010
|Risk allocation in public-private partnership water supply projects in Ghana
Taylor & Francis Verlag | 2015
|