Comparing Cost, Schedule, and Quality of CM/GC and DBB Project Delivery for Repetitive Commercial Construction
Design/Bid/Build (DBB) delivery is the traditional approach for establishing the least cost for building projects, but other alternative project delivery methods have become increasingly popular. Although multiple studies have compared delivery methods for vertical construction, there have not been any comprehensive studies quantifying how delivery methods compare specifically for repetitive commercial construction. This research utilized a mixed methods approach to compare the cost, schedule, and quality of Construction Manager/General Contractor (CM/GC) delivered projects with DBB projects for repetitive commercial construction, using 173 facilities built with the same base floorplan. A comprehensive quantitative comparison was conducted, excluding potential confounding variables and including short- and long-term direct and indirect costs, construction time, and quality assessment scores. Contractors and project managers were also surveyed regarding their perceptions of CM/GC process effectiveness in a repetitive construction environment. This research demonstrated that the CM/GC delivery method was more effective for repetitive commercial construction, uniquely quantifying the relative cost, schedule, and quality improvements of CM/GC delivery over DBB projects. Compared to DBB, CM/GC projects produced total construction cost savings of 5.4%, a 20% shorter construction cycle time, consistently higher quality assessment scores, and an overall reduction in repair costs of 34%.
Comparing Cost, Schedule, and Quality of CM/GC and DBB Project Delivery for Repetitive Commercial Construction
Design/Bid/Build (DBB) delivery is the traditional approach for establishing the least cost for building projects, but other alternative project delivery methods have become increasingly popular. Although multiple studies have compared delivery methods for vertical construction, there have not been any comprehensive studies quantifying how delivery methods compare specifically for repetitive commercial construction. This research utilized a mixed methods approach to compare the cost, schedule, and quality of Construction Manager/General Contractor (CM/GC) delivered projects with DBB projects for repetitive commercial construction, using 173 facilities built with the same base floorplan. A comprehensive quantitative comparison was conducted, excluding potential confounding variables and including short- and long-term direct and indirect costs, construction time, and quality assessment scores. Contractors and project managers were also surveyed regarding their perceptions of CM/GC process effectiveness in a repetitive construction environment. This research demonstrated that the CM/GC delivery method was more effective for repetitive commercial construction, uniquely quantifying the relative cost, schedule, and quality improvements of CM/GC delivery over DBB projects. Compared to DBB, CM/GC projects produced total construction cost savings of 5.4%, a 20% shorter construction cycle time, consistently higher quality assessment scores, and an overall reduction in repair costs of 34%.
Comparing Cost, Schedule, and Quality of CM/GC and DBB Project Delivery for Repetitive Commercial Construction
Patterson, Donald A. (author) / Farnsworth, Clifton B. (author) / Hutchings, D. Mark (author) / Eggett, Dennis L. (author) / Weidman, Justin E. (author)
International Journal of Construction Education and Research ; 19 ; 166-186
2023-04-03
21 pages
Article (Journal)
Electronic Resource
Unknown
Integrated Schedule and Cost Model for Repetitive Construction Process
Online Contents | 2010
|Project control : integrating cost and schedule in construction
UB Braunschweig | 2013
|Project control : integrating cost and schedule in construction
TIBKAT | 2023
|Project control : integrating cost and schedule in construction
TIBKAT | 2013
|Optimal Schedule Planning for Multiple, Repetitive Construction Process
British Library Online Contents | 2001
|