A platform for research: civil engineering, architecture and urbanism
The livelihood reconstruction of resettlers from the Nam Ngum 1 hydropower project in Laos
The Nam Ngum 1 hydropower project took place in the early 1970s and displaced about 23 villages and 570 households. This research focuses on two resettlement villages: Pakcheng and Phonhang. A comparison is made concerning the livelihood conditions of these two villages, resettled in 1968 and 1977, respectively. The methodology involved consultation meetings in each village and one-on-one interviews of 100 households (50 households per village). This case study has determined that in terms of family income for these two villages, Pakcheng is significantly more affluent than Phonhang. This is probably because Pakcheng is located along a main road and has far better facilities and irrigation systems.
The livelihood reconstruction of resettlers from the Nam Ngum 1 hydropower project in Laos
The Nam Ngum 1 hydropower project took place in the early 1970s and displaced about 23 villages and 570 households. This research focuses on two resettlement villages: Pakcheng and Phonhang. A comparison is made concerning the livelihood conditions of these two villages, resettled in 1968 and 1977, respectively. The methodology involved consultation meetings in each village and one-on-one interviews of 100 households (50 households per village). This case study has determined that in terms of family income for these two villages, Pakcheng is significantly more affluent than Phonhang. This is probably because Pakcheng is located along a main road and has far better facilities and irrigation systems.
The livelihood reconstruction of resettlers from the Nam Ngum 1 hydropower project in Laos
Souksavath, Bounsouk (author) / Maekawa, Miko (author)
International Journal of Water Resources Development ; 29 ; 59-70
2013-03-01
12 pages
Article (Journal)
Electronic Resource
English
dam , hydropower , Laos , Nam Ngum River , resettlement
Reconstruction of the livelihood of resettlers from the Nam Theun 2 hydropower project in Laos
Taylor & Francis Verlag | 2013
|The livelihood reconstruction of resettlers from the Nam Ngum 1 hydropower project in Laos
Online Contents | 2013
|Reconstruction of the livelihood of resettlers from the Nam Theun 2 hydropower project in Laos
Online Contents | 2013
|Risk Analysis of Reservoir Resettlers with Different Livelihood Strategies
DOAJ | 2022
|Livelihood status of resettlers affected by the Saguling Dam project, 25 years after inundation
Online Contents | 2013
|