A platform for research: civil engineering, architecture and urbanism
Watershed Rehabilitation Program related to the Management of River and Reservoir Sedimentation in Indonesia
Problems of sedimentation in Indonesia are basically caused by population problems (i.e., high population density, high population growth and unequal distribution) and improper use of the land without appropriate soil conservation measures. The erosion rate on dry land reached nearly 4 cm a year and a t present 8.5 million hectares are considered as critical lands. The government of Indonesia has made great efforts to control soil erosion and sedimentation through the watershed rehabilitation program in 36 groups of priority watersheds based on Presidential Instruction Projects.
Regreening projects on private lands have involved more than 1.95 million hectares and reforestation projects on state forest areas have an annual target of about 300 000 hectares. These projects have increased land productivity, provided more permanent labor opportunities and have been investigated as economically feasible actions.
The government h a s created, with ample funds, a large field organization as a culmination of all efforts in finding a solution for more effective erosion and sedimentation control.
Watershed Rehabilitation Program related to the Management of River and Reservoir Sedimentation in Indonesia
Problems of sedimentation in Indonesia are basically caused by population problems (i.e., high population density, high population growth and unequal distribution) and improper use of the land without appropriate soil conservation measures. The erosion rate on dry land reached nearly 4 cm a year and a t present 8.5 million hectares are considered as critical lands. The government of Indonesia has made great efforts to control soil erosion and sedimentation through the watershed rehabilitation program in 36 groups of priority watersheds based on Presidential Instruction Projects.
Regreening projects on private lands have involved more than 1.95 million hectares and reforestation projects on state forest areas have an annual target of about 300 000 hectares. These projects have increased land productivity, provided more permanent labor opportunities and have been investigated as economically feasible actions.
The government h a s created, with ample funds, a large field organization as a culmination of all efforts in finding a solution for more effective erosion and sedimentation control.
Watershed Rehabilitation Program related to the Management of River and Reservoir Sedimentation in Indonesia
Sutadipradja, Engkah (author) / Hardjowitjitro, Hardjono (author)
Water International ; 9 ; 146-149
1984-01-01
4 pages
Article (Journal)
Electronic Resource
Unknown
Reservoir Sedimentation in Barlad Watershed
British Library Conference Proceedings | 2004
|Sedimentation and Watershed Management Of Krishnagiri Reservoir, India
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 2010
|Controlling reservoir sedimentation through watershed treatments - a review
British Library Online Contents | 2002
|Ambuklao hydroelectric scheme - sedimentation of the reservoir and rehabilitation program
British Library Conference Proceedings | 2003
|Reservoir sedimentation associated with landsliding, Atrak watershed, Iran
Online Contents | 2004
|