A platform for research: civil engineering, architecture and urbanism
A Case Study of the Management of Innovation Implementation within a Construction Project Organization
The purpose of this paper is to analyse and present how an innovative idea can be successfully implemented in a construction project organisation, through the case study approach. The scope of the innovation is the top-down construction technique that was implemented successfully in a building project in Singapore. The sequence of construction makes top-down construction different from conventional technique. In conventional construction, the sequence starts from the very bottom level of structure with fully completed sub-structure. In the case of the top-down technique, construction of super-structure and sub-structure can be undertaken simultaneously with the help of partially finished main support at basement and substructure level.
It is concluded that the innovative technique could be successfully implemented because three main forces exist in the construction project organisation: (1) expectancy driven normative forces; (2) result driven instrumental forces; and (3) inter-organisational interactive forces. This paper is important because it shows that for innovation to be successfully implemented, the following conditions must be met: (1) clients must play an active role in the innovation; (2) client and the party who proposes the innovation must have strong bargaining positions; (3) other supporting parties to the innovation must be willing to compromise and have good working relationships with one another.
A Case Study of the Management of Innovation Implementation within a Construction Project Organization
The purpose of this paper is to analyse and present how an innovative idea can be successfully implemented in a construction project organisation, through the case study approach. The scope of the innovation is the top-down construction technique that was implemented successfully in a building project in Singapore. The sequence of construction makes top-down construction different from conventional technique. In conventional construction, the sequence starts from the very bottom level of structure with fully completed sub-structure. In the case of the top-down technique, construction of super-structure and sub-structure can be undertaken simultaneously with the help of partially finished main support at basement and substructure level.
It is concluded that the innovative technique could be successfully implemented because three main forces exist in the construction project organisation: (1) expectancy driven normative forces; (2) result driven instrumental forces; and (3) inter-organisational interactive forces. This paper is important because it shows that for innovation to be successfully implemented, the following conditions must be met: (1) clients must play an active role in the innovation; (2) client and the party who proposes the innovation must have strong bargaining positions; (3) other supporting parties to the innovation must be willing to compromise and have good working relationships with one another.
A Case Study of the Management of Innovation Implementation within a Construction Project Organization
Ling, Florence Yean Yng (author) / Dulaimi, Mohammed Fadhil (author) / Kumaraswamy, Mohan (author) / Bajracharya, Arun (author)
International Journal of Construction Management ; 3 ; 79-91
2003-01-01
13 pages
Article (Journal)
Electronic Resource
English
Integrated project management information systems in construction: a case study implementation
British Library Conference Proceedings | 2003
|Electronic Document Management Systems in Construction: A project-based case study implementation
British Library Conference Proceedings | 2003
|Managing the implementation of component innovation within construction projects
British Library Conference Proceedings | 2010
|British Library Conference Proceedings | 1995
|