A platform for research: civil engineering, architecture and urbanism
Optimal control strategies of eight parallel heat pumps using Gaussian process emulator
This study describes the development of the optimal control strategies of eight parallel heat pumps in an existing building. The building consists of seven floors above ground and two floors underground with a total floor area of 22,440 m2. The chilled water generated by each of the eight parallel heat pumps runs through a common primary pipe to multiple air-handling units in the building. Because only one flowmeter and two thermometers (entering and exiting) are installed in the primary pipe, the heat removal rate and efficiency of each heat pump are unknown. The existing control of the heat pumps is as follows: if the chilled water return temperature in the primary pipe becomes greater than a predetermined temperature, the controller increases the number of operating heat pumps. The heat removal rate and efficiency of each heat pump were first identified using a Gaussian process (GP) machine-learning algorithm to develop the optimal control strategy of the eight heat pumps. Two GP models, one for estimating the heat removal rate and the other for estimating the coefficient of performance (COP), were developed based on the measured data for 27 days in July at the sampling time of 15 min. After developing the GP models, the authors applied a COP-based sequencing control strategy to the eight parallel heat pumps. The new optimal control strategy is to switch on the heat pumps in order from highest to lowest COP. Compared with the existing control logic, the new optimal control can reduce energy consumption by 20.9%.
Optimal control strategies of eight parallel heat pumps using Gaussian process emulator
This study describes the development of the optimal control strategies of eight parallel heat pumps in an existing building. The building consists of seven floors above ground and two floors underground with a total floor area of 22,440 m2. The chilled water generated by each of the eight parallel heat pumps runs through a common primary pipe to multiple air-handling units in the building. Because only one flowmeter and two thermometers (entering and exiting) are installed in the primary pipe, the heat removal rate and efficiency of each heat pump are unknown. The existing control of the heat pumps is as follows: if the chilled water return temperature in the primary pipe becomes greater than a predetermined temperature, the controller increases the number of operating heat pumps. The heat removal rate and efficiency of each heat pump were first identified using a Gaussian process (GP) machine-learning algorithm to develop the optimal control strategy of the eight heat pumps. Two GP models, one for estimating the heat removal rate and the other for estimating the coefficient of performance (COP), were developed based on the measured data for 27 days in July at the sampling time of 15 min. After developing the GP models, the authors applied a COP-based sequencing control strategy to the eight parallel heat pumps. The new optimal control strategy is to switch on the heat pumps in order from highest to lowest COP. Compared with the existing control logic, the new optimal control can reduce energy consumption by 20.9%.
Optimal control strategies of eight parallel heat pumps using Gaussian process emulator
Ahn, Ki Uhn (author) / Park, Sung Ho (author) / Hwang, Seungho (author) / Choi, Sunkyu (author) / Park, Cheol Soo (author)
Journal of Building Performance Simulation ; 12 ; 650-662
2019-09-03
13 pages
Article (Journal)
Electronic Resource
English
British Library Online Contents | 2013
|